Laserfiche WebLink
SC -6.08 Permits <br />SC -6.08 Add the following paragraphs immediately after paragraph GC -6.08.A: <br />1. The OWNER will obtain the following permits: <br />A. City of Vero Beach Site Modification Permits CC16-000497 and <br />CC 17-00128 <br />2. The CONTRACTOR shall apply for and obtain: <br />A. The County/City Building Application #2017030231. <br />Please note that the building permit application for the project has been <br />reviewed by the County Building Department. <br />3. The CONTRACTOR shall obtain and pay for all other required permits and <br />licenses. The CONTRACTOR shall provide copies of the permits to the <br />OWNER and ENGINEER and shall comply with all conditions contained in <br />the permits at no extra cost to the OWNER. <br />4. The CONTRACTOR shall be familiar with all permit requirements during <br />construction and shall be responsible for complying with these <br />requirements. The cost of this effort shall be included in the pay item in <br />which the work is most closely associated with. <br />SC -11.01 Cost of the Work <br />SC -11.01.A.1. Delete paragraph GC -11.01.A.1 in its entirety, and insert the following sentences <br />in its place: <br />SC -13.03 <br />1. CONTRACTOR will receive payment for actual costs of direct labor and burden <br />(see SC -2.06.B) for the additional or unforeseen work. Labor includes foremen <br />actually engaged in the work; and will not include project supervisory personnel nor <br />necessary on-site clerical staff, except when the additional or unforeseen work is a <br />controlling work item and the performance of such controlling work item actually <br />extends completion of the project due to no fault of the Contractor. Compensation <br />for project supervisory personnel, but in no case higher than a Project Manager's <br />position, shall only be for the pro -rata time such supervisory personnel spent on <br />the contract. In no case shall an officer or director of the Company, nor those <br />persons who own more than 1% of the Company, be considered as project <br />supervisory personnel, direct labor or foremen hereunder. The expenses of <br />performing Work outside of regular working hours, on Saturday, Sunday, or legal <br />holidays, shall be included in the above to the extent authorized by OWNER. <br />Test and Inspections <br />SC -13.03.B. Delete paragraph GC -13.03.8 in its entirety, and insert the following sentences in <br />its place: <br />B. OWNER shall employ and pay for the services of an independent testing laboratory to <br />perform all initial inspections, tests, or approvals required by the Contract Documents <br />except those inspections, tests, or approvals listed immediately below. Subsequent <br />inspections, tests, or approvals required after initial failing inspections, tests, or <br />approvals shall be paid for by the CONTRACTOR by back charge to subsequent <br />00800-7 <br />00800 - Supplementary Conditions 05-13 rev.doc <br />00800 7F:\Public Works\ENGINEERING DIVISION PROJECTS\1621 IRC Courthouse Judges Security Upgrades\1-Admin\Bid Documents4Master Contract <br />Documents\00800 - Supplementary Conditions 05-13 rev.doc <br />