My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-086A
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-086A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2017 10:49:06 AM
Creation date
7/12/2017 4:25:16 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/13/2017
Control Number
2017-086A
Agenda Item Number
8.C.
Entity Name
Indian River County Courthouse
Subject
Judge's Security Upgrade Project
Area
Courthouse
Project Number
IRC-1621
Bid Number
2017050
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br />CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br />1.1 SCOPE <br />A. Provide all construction equipment and facilities and temporary controls <br />required to satisfactorily complete the work represented on the Drawings <br />and described in the Specifications. <br />1.2 RESPONSIBILITY <br />A. All construction facilities and temporary controls remain the property of the <br />Contractor establishing them and shall be maintained in a safe and useful <br />condition until removed from the construction site. <br />B. All false work, scaffolding, ladders, hoistways, braces, pumps, roadways, <br />sheeting, forms, barricades, drains, flumes, and the like, any of which may <br />be needed in construction of any part of the work and which are not herein <br />described or specified in detail, must be furnished, maintained and <br />removed by the CONTRACTOR, who is responsible for the safety and <br />efficiency of such work and for any damage that may result from their <br />failure or from their improper construction, maintenance or operation. <br />C. In accepting the Contract, the CONTRACTOR assumes full responsibility <br />for the sufficiency and safety of all hoists, cranes, temporary structures or <br />work and for any damage which may result from their failure or their <br />improper construction, maintenance or operation and will indemnify and <br />save harmless the OWNER and ENGINEER from all claims, suits or <br />actions and damages or costs of every description arising by reason of <br />failure to comply with the above provision. <br />1.3 TEMPORARY UTILITIES AND SERVICES <br />A. TEMPORARY WATER <br />1. Provide a temporary water service as required for all construction <br />purposes and pay for all water used. <br />2. Furnish potable drinking water in suitable dispensers and with cups <br />for use of all employees at the job. <br />3. Provide all temporary piping, hoses, etc., required to transport <br />water to the point of usage by all trades. <br />4. When temporary water service is no longer required, remove all <br />temporary water lines. <br />01520-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1621 IRC Courthouse Judges Security Upgrades\1-Admin\Bid <br />Documents\Master Contract Documents\01520 - Construction Facilities.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.