My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-086A
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-086A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2017 10:49:06 AM
Creation date
7/12/2017 4:25:16 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/13/2017
Control Number
2017-086A
Agenda Item Number
8.C.
Entity Name
Indian River County Courthouse
Subject
Judge's Security Upgrade Project
Area
Courthouse
Project Number
IRC-1621
Bid Number
2017050
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />1.3 TREE AND PLANT PROTECTION <br />A. Protect existing trees, shrubs and plants on or adjacent to the site that are <br />shown or designated to remain in place against unnecessary cutting, breaking or <br />skinning of trunk, branches, bark or roots. <br />B. Do not store or park materials or equipment within the drip line of trees that are <br />to remain. <br />C. Install temporary fences or barricades to protect trees and plants in areas <br />subject to traffic. <br />D. Fires shall not be permitted under or adjacent to trees and plants. <br />E. Within the limits of the Work, water trees and plants that are to remain, in order <br />to maintain their health during construction operations. <br />F. Cover all exposed roots with burlap and keep it continuously wet. Cover all <br />exposed roots with earth as soon as possible. Protect root systems from <br />mechanical damage and damage by erosion, flooding, run-off or noxious <br />materials in solution. <br />G. If branches or trunks are damaged, prune branches immediately and protect the <br />cut or damaged areas with emulsified asphalt compounded specifically for <br />horticultural use. <br />H. Remove all damaged trees and plants that die or suffer permanent injury and <br />replace them with a specimen of equal or better quality. <br />I. Coordinate Work in this Section with requirements of other sections herein. <br />1.4 PROTECTION OF IRRIGATION <br />The CONTRACTOR shall be responsible for maintaining in good condition all <br />irrigation systems within the easements, which could be damaged by <br />construction activities. The CONTRACTOR shall repair any irrigation systems <br />damaged by construction activities within two (2) days. Irrigation systems <br />partially within the right-of-way of 15th Avenue and all intersecting side streets <br />within project limits may be cut off and capped or connected to same system to <br />maintain functionality. The CONTRACTOR shall be responsible for maintaining <br />the functionality of the remaining portion of the system if it should fall outside of <br />the right-of-way. <br />01541-2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1621 IRC Courthouse Judges Security Upgrades\1-Admin\Bid Documents\Master <br />Contract Documents\01'541 - Protection of Property.doc ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.