My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-086A
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-086A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2017 10:49:06 AM
Creation date
7/12/2017 4:25:16 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
06/13/2017
Control Number
2017-086A
Agenda Item Number
8.C.
Entity Name
Indian River County Courthouse
Subject
Judge's Security Upgrade Project
Area
Courthouse
Project Number
IRC-1621
Bid Number
2017050
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01630 <br />SUBSTITUTIONS <br />c. Samples, if appropriate. <br />d. Name and address of similar projects on which product was used, <br />and date of installation. <br />2. For construction methods (if specified): <br />a. Detailed description of proposed method. <br />• b. Drawings illustrating method. <br />3. Such other data as the ENGINEER may require to establish that the <br />proposed substitution is equal to the product, manufacturer or method <br />specified. <br />C. In making Request for Substitution, CONTRACTOR represents that: <br />1. CONTRACTOR has investigated proposed substitution, and deter- <br />mined that it is equal to or superior in all respects to the product, <br />manufacturer or method. specified. <br />2. CONTRACTOR will provide the same or better guarantees or <br />warranties for proposed substitution as for product, manufacturer, or <br />method specified. <br />3. CONTRACTOR waives all claims for additional costs or extension of <br />time related to a proposed substitution that subsequently may become <br />apparent. <br />D. A proposed substitution will not be accepted if: <br />1. Acceptance will require changes in the design concept or a substantial <br />revision of the Contract Documents. <br />2. It will delay completion of the Work, or the work of other contractors. <br />3. It is indicated or implied on a Shop Drawing and is not accompanied by <br />a formal Request for Substitution from CONTRACTOR. <br />E. If the ENGINEER determines that a proposed substitute is not equal to that <br />specified, furnish. the product, manufacturer, or method specified at no additional <br />cost to OWNER. <br />F. Approval of a substitution will not relieve CONTRACTOR from the requirement <br />for submission of Shop Drawings as, set forth in the Contract Documents. <br />G. The procedure for review by Engineer will include the following: <br />1. Requests for review of substitute items of material and equipment will <br />not be accepted by Engineer from anyone other than CONTRACTOR. <br />2. Upon receipt of an application for review of a substitution, Engineer will <br />determine whether the review will be more extensive than a normal shop <br />drawing review for the specified item. <br />3. If the substitution will not require a more extensive review, Engineer will <br />proceed with the review without additional cost to CONTRACTOR. <br />01630-2 01630 Substitutions <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1621 IRC Courthouse Judges Security Upgrades\1-Admin\Bid Documents\Master <br />Contract Documents\01630 - Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.