Laserfiche WebLink
HySecuri <br />Simple. Reliable. Secure. <br />TECHNICAL SPECIFICATIONS for Model <br />SlideDriverTM 50VF2/3 (222 X3 ST) <br />Variable Speed Hydraulic Slide Gate Operator <br />for Gates up to 5,000 Ib (2,268 kg) <br />With Smart Touch Controller <br />02827 HYS <br />PART 1 — GENERAL <br />6623 South 228th tiirecl <br />Kent. Washington 08032 <br />ph 1-800-321 -9947 <br />fax 1-888-321-9946 <br />www.hysecurity.com <br />1.1. INCLUDED IN THIS SECTION <br />A. Pre -wired gate operator for horizontal sliding gates, including all selected attachments and accessory <br />equipment. <br />B. For further information, call the manufacturer at (800) 321-9947 or visit the website at <br />www.hysecurity.com. <br />1.2. RELATED WORK SPECIFIED ELSEWHERE <br />A. Fencing: See section 02815. <br />B. Cast in place concrete: See section 03300. <br />C. Electrical service and connections: See section 16512. <br />1.3. SUBMITTALS <br />A. Shop drawings: Submit shop drawings under the provisions of Section 01300. Submit drawings <br />showing connections to adjacent construction, range of travel, and all electrical and mechanical <br />connections to the operator. All underground runs of electrical lines and inductive vehicle obstruction <br />loop locations shall be indicated on drawings. Drawings shall also show the size and location of the <br />concrete mounting pad. <br />B. Installation instructions: Submit two copies of manufacturer's installation instructions for this specific <br />project. <br />C. Submit manufacturer's completed warranty registration form to Project Manager. <br />D. Project list: Submit list of product installations comparable to the subject job. Include date of product <br />installation, installer, and owners name and location of the project. <br />E. Test reports: <br />1. Submit affidavits from the manufacturer demonstrating that the gate operator mechanism has <br />been tested to 200,000 cycles without breakdown. <br />2. Each operator shall bear a label indicating that the operator mechanism has been tested. <br />Operator is tested for full power and pressure of all hydraulic components, full stress tests of all <br />mechanical components and electrical tests of all overload devices. <br />1.4. QUALITY ASSURANCE <br />A. Manufacturer: A company specializing in the manufacture of gate operators of the type specified, with a <br />minimum of five years' experience manufacturing operators of this type and design. <br />B. Installer: Must have a minimum of three years' experience installing similar equipment, provide proof of <br />attending a HySecurity Technical Training within the previous three years, or obtain other significant <br />manufacturer endorsement of technical aptitude, if required, during the submittal process. <br />1.5. CODES AND REGULATORY REQUIREMENTS <br />A. Operators shall be built to UL 325 standards and be listed by a nationally recognized testing laboratory. <br />Complete all electrical work according to local codes and National Electrical Code. All fieldwork shall <br />www.hysecurity.com <br />Specification D0677 <br />