My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/06/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
06/06/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:44:32 PM
Creation date
7/13/2017 11:17:18 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/06/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?E <br />INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Jason E. BrCounty Administrator <br />THROUGH: Stan Boling, AICP; Community Development Director <br />rA <br />FROM: John W. McCoy, AICP; Chief, Current Development <br />DATE: May 25, 2017 <br />SUBJECT: DiVosta Homes, LP's Request for Final Plat Approval for The Lakes at <br />Waterway Village POD 3R [PD -16-03-02 / 2004010124-78246 <br />It is requested that the data herein presented be given formal consideration by the Board of <br />County Commissioners at its regular meeting of June 6, 2017. <br />DESCRIPTION & CONDITIONS: <br />The Lakes at Waterway Village POD 3R is a phase within the Waterway Village planned <br />development project and consists of 88 lots on 26.2 acres. It is located east of 5111 Court, south <br />of 53`d Street, and adjacent to a portion of the future 43d Avenue extension. The property is <br />zoned PD (Planned Development), has an L-2 (Low Density 2 up to 6 units per acre) land use <br />designation, and will have a density of 3.36 units per acre. <br />On April 14, 2016, the Planning & Zoning Commission granted preliminary PD plan/plat <br />approval for The Lakes at Waterway Village POD 31;, which contains 88 lots on 26.2 acres. The <br />applicant is now seeking final plat approval for POD 3R, having obtained a land development <br />permit and commencing construction of the project. At this time, the applicant has built 77.07% <br />of the required improvements that serve the POD 3R area, is proposing to "bond -out" for the <br />remaining 22.93% of the required improvements, and has submitted the following: <br />T. A final plat in conformance with the approved preliminary plat; <br />2. An Engineer's Certified Cost Estimate for the remaining required improvements; <br />3. A Contract for Construction of remaining required improvements; and <br />4. A letter of credit in the amount of $447,439.71 <br />The Board is now to consider granting final plat approval for The Lakes at Waterway Village <br />POD 3R. <br />FACommunity DevelopmenACurDevOnal P1ats\BCC staffreporGs12017 FPrptsU akesatWWVPOD3R(78246).rtf <br />P43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.