My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/16/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
05/16/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:38:58 PM
Creation date
7/17/2017 11:10:19 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/16/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
restricted to a single lane. <br />ARTICLE 2 ENGINEER <br />The North County Commercial Sewer & Water project has been designed by Masteller & Moler, <br />Inc., hereinafter called ENGINEER, and who is to act as OWNER'S representative, assume all <br />duties and responsibilities and have the rights and authority assigned to ENGINEER in the <br />Contract Documents in connection with completion of the work in accordance with the Contract <br />Documents. <br />ARTICLE 3 CONTRACT TIME <br />r^ <br />3.1 The CONTRACTOR shall be substantially completed witl,the following timeframe: <br />(a) Within 30 calendar days from effective date of Notice`1d"..Proceed, Contractor shall <br />complete the following tasks: <br />,4 <br />1. Obtain all necessary permits; <br />2. Receive approved;E'shop`;drawings for all material§:and°equipment to <br />be utilized on th6Job. <br />3. Perform all 'phbtographici.. recordig, and u"documentation of <br />conditions:prior to-':constructigh. <br />4. Locate all`6xisting Utilitiesjn'the area of work. <br />5. Submit an'8 secure approval of shop drawings. <br />6. Mobilize all"labor; equipment, and materials. <br />7. Deliver and"'More all'equipment and materials to the job site. <br />8. Notify all ufilties an. other","affected parties prior to initiating <br />const'rtirtion <br />(b) From; .31 calendar'days to 27..0calendar days from the effective date of Notice to <br />Proceed:;; the CONTRACTOR s"ri'alftomplete the following tasks: <br />1. 6 fr4:'lnstall all 'pipe„and appurtenant items. <br />Perform all testing. <br />3 „Restore„all,.disturbed areas to their pre -construction condition. <br />4.'' ' Correct all deficiencies noted by Engineer. <br />. <br />ompletion of;all tasks outlined above (i.e., Subparagraphs a) and b) constitutes <br />Substantial:.Completion. <br />(c) From 27,1';';calendar days to 330 calendar days from the effective date of Notice to <br />Proceed{'.the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />2. Remove all equipment and material from project site. <br />3. Perform contract closeout procedures. <br />3.2 Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final <br />Completion. <br />3.3 Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence <br />of this Agreement and that OWNER will suffer financial loss if the work is not completed <br />00530-2 <br />P177 <br />