My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/16/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
05/16/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:38:58 PM
Creation date
7/17/2017 11:10:19 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/16/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />5 May 2017 <br />Page 2 <br />Geosyntec <br />consultants <br />In consideration of the ongoing natural attenuation processes occurring at the site, the enhancement <br />of these biological processes via the injection of an electron donor was proposed, and agreed to in <br />concept by the FDEP in correspondence dated 2 August 2006. In response to FDEP's request and <br />supported by groundwater monitoring results,, Geosyntec prepared a RAP Modification (RAPM) <br />Addendum No. 3 (RAPM3) in May 2016 to propose a focused injection of EOS® in the vicinity <br />of GR-MW30B and implemented the injection activities in April 2017. <br />PROPOSED SCOPE OF WORK <br />The proposed scope of work consists of semi-annual groundwater monitoring and reporting and <br />related activities to be performed on behalf of IRC SWDD at the Former South Gifford Road <br />Landfill. For the purpose of budgeting, the scope of work has been divided into the following <br />tasks: <br />• Task 1— Project Management; <br />• Task 2 — Meetings/Regulatory Interaction; <br />• Task 3 — Annual Pollution Remediation Liabilities Evaluation; <br />• Task 4 — Semi -Annual Sampling Activities; and <br />• 'Task 5 _ Data Evaluation and Semi -Annual Reporting. <br />The remainder of this section presents a general description of the activities to be performed in <br />each task. <br />Task 1 — Proiect Management: Under this task, Geosyntec will perform project planning and <br />management responsibilities, such as correspondence with IRC SWDD and FDEP, invoice review, <br />project coordination, and project administration. The budget includes eight hours per <br />sampling/reporting event for the project manager and two hours for the principal -in -charge. <br />Task 2 — Meetings/Regulatory Interaction: Under this task, Geosyntec will prepare for and <br />attend up to two meetings, with IRC SWDD, FDEP, and/or IRC Board of County Commission, as <br />necessary. It has been assumed that one of these meetings will be in person and one meeting with <br />be attended by conference call. Also, under this task, four hours has been included for the project <br />manager to provide ongoing support to IRC SWDD related to interaction and negotiation with <br />FDEP. <br />Task 3 — Annual Pollution Remediation Liabilities Evaluation: As requested by IRC SWDD, <br />under this task, Geosyntec will prepare the annual environmental liability evaluation. This <br />document is prepared annually in response to Governmental Accounting Standards Board <br />Statement No. 49 (GASB No. 49), Accounting and Financial Reporting for Pollution Remediation <br />Obligations, which requires the inclusion and calculation of pollution remediation obligations. The <br />XR17051\PR17015 <br />engineers I scientists I innovators <br />P224 <br />
The URL can be used to link to this page
Your browser does not support the video tag.