Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />5 May 2017 <br />Page 4 <br />Geosyntec <br />consultants <br />monitoring well, including existing monitoring wells and applicable City of Vero Beach wells <br />(assumed up to 88 wells per event). <br />It is anticipated that purge water (investigation -derived waste [IDWJ) will be containerized in 55 - <br />gallon polyethylene drums and temporarily staged on Site for characterization prior to removal <br />and disposal. Costs are included herein for two 55 -gallon polyethylene drums and oversight of <br />drum disposal concurrent with one of the sampling events. <br />Overall, budget has been included for seven field days with a two -person team (i.e., 14 man days) <br />and associated field expenses for sampling, plus four hours for IDW management. <br />Task 6 — Data Evaluation and Semi -Annual Reporting: Under this task, Geosyntec will perform <br />data evaluation activities and reporting. The reporting includes .preparation of one semi-annual <br />report (simplified format) and one annual report for submittal to FDEP. <br />The annual report will be consistent with the groundwater monitoring reports historically <br />submitted to FDEP for this Site and the data evaluation activities will include database <br />management, screening results against applicable regulatory criteria, GIS figure preparation, time <br />trend analyses, and/or statistical data analyses. This report will be prepared following the summer <br />groundwater sampling event. The annual report will be supported by attachments containing <br />Chain -of -Custody sheets, field notes and observations, water sampling logs, maps, graphs, <br />analytical results, and any other applicable materials. <br />The semi-annual report will be a letter report with attachments, including a monitoring well <br />location map and tables of the field and laboratory results. Data evaluation activities for the semi- <br />annual report will include database management, screening results against applicable regulatory <br />criteria, and summary data table preparation. This report will be prepared following the fall/winter <br />groundwater sampling event. <br />The draft annual and semi-annual .reports will be submitted to IRC SWDD for review prior to <br />submittal to FDEP. Each final report will be signed and sealed by a Florida registered professional <br />engineer or geologist. <br />SCHEDULE <br />Geosyntec will conduct the groundwater monitoring and reporting activities on a semi-annual basis <br />as described herein. The semi-annual groundwater monitoring events will be tentatively conducted <br />in June and December 2017. <br />XR17051\PR17015 <br />engineers I scientists I innovators <br />P226 <br />