Laserfiche WebLink
PR17015 <br />Table 4 <br />MAY 2017 BUDGET ESTIMATE <br />SOUTH GIFFORD ROAD LANDFILL <br />PHASE 4: Semi -Annual Sampling Activities <br />ITEM <br />BASIS <br />RATE <br />QUANTITY <br />.ESTIMATED <br />BUDGET <br />Senior Project Geologist <br />hr <br />$188 <br />4 <br />$752 <br />Geologist <br />hr <br />$134 <br />16 <br />$2,144 <br />Senior Staff Geologist <br />hr <br />$119 <br />100 <br />$11,900 <br />Subtotal Professional Services <br />$14,796 <br />cnti c W,r i t ati cr:vi � .srx �.x#�'.;;:�-�'' <br />����,r� <br />AN +A <br />Field Superintendent. <br />hr <br />$119 <br />100 <br />$11,900 <br />Administrative Assistant <br />hr <br />$94 <br />2 <br />$188 <br />Subtotal Technical/Administrative Services <br />$12,088 <br />•.;''S 9Ct.% 'z v�''"$ s +^ 'C+` <br />, °il��'- �`,u`�? � <br />Laboratory Analysis for VOCs <br />each <br />$59 <br />62 <br />$3,649 <br />Laboratory Analysis for TOC <br />each <br />$27 <br />5 <br />$134 <br />Laboratory Analysis for Dissolved Gases <br />each <br />$80 <br />6 <br />$482 <br />Laboratory Analysis for UIC parameters <br />each <br />$163 <br />2 <br />$325 <br />Laboratory Analysis for Dhc <br />each <br />$305 <br />2 <br />$610 <br />Laboratory Analysis for vcrA <br />each <br />$90 <br />2 <br />$180 <br />Subtotal Services <br />$5,379 <br />6SCiH'�wu� iSa � �i3.71 7s �� OWN <br />gS,ubcjo�ntr�ga�ctor <br />K <br />9=90,51-11 <br />PDBs for Summer event <br />quote <br />$32 <br />5 <br />$160 <br />PDBs for Winter event <br />quote <br />$32 <br />38 <br />$1,218 <br />Drums <br />each <br />$50 <br />2 <br />$100 <br />Drum Transport <br />each <br />$963 <br />2 <br />$1,926 <br />Lodging <br />day <br />$134 <br />14 <br />$1,876 <br />Per Diem <br />day <br />$59 <br />14 <br />$826 <br />Communications Fee <br />3% labor <br />0.03 <br />$26,884 <br />$807 <br />Field Vehicle <br />day <br />$80 <br />14 <br />$1,120 <br />8.5"xIV Photocopies <br />each <br />$0.12 <br />160 <br />-$19 <br />Overnight Cooler <br />each <br />$95 <br />4 <br />$380 <br />Groundwater Sampling Kit (per sampler) <br />day <br />$300 <br />8 <br />$2,400 <br />Water Level Measurement Kit (2 person team day <br />$55 <br />2 <br />$110 <br />PDB Deployment Kit <br />day <br />$100 <br />2 <br />$200 <br />Equipment ShippingE <br />each <br />$54 <br />3 <br />$162 <br />Subtotal Reimbursables <br />$11,304 <br />Eff NOARMMAN- La;ES._ <br />1 B. P' '5 4 $43;SG <br />Notes: <br />1. Lodging and per diem rates were taken from the GSA wabsite for the Vero Beach area (www.gsa gov). <br />2. Groundwater Sampling Kit includes two sets of the following: water level indicator, peristaltic pump, water quality meter (pli, <br />temperature, conductivity, dissolved oxygen, and ooddation reduction potential), turbidity meter, tubing, and miscellaneous field supplies <br />3. Water Level Measurement Kit includes: water level indicator and miscellaneous field supplies. <br />4. PDB Deployment Kit includes: miscellaneous field supplies necessary to suspend and deploy PDBs. <br />5. UIC parameters include total recoverable petroleum hydrocarbons, polysorbate 80 surfactant, sodium, chloride, and total dissolved solids <br />Geosyntec Consultants <br />P232 <br />