My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/16/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
05/16/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:38:58 PM
Creation date
7/17/2017 11:10:19 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/16/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br />No. 2017-003 <br />Park Place Mobile Home Park Water Services Replacement Project <br />BLUE GOOSE CONSTRUCTION <br />DATE .OF ISSUANCE: March 22, 2017 <br />ATTACHMENT 1 <br />EFFECTIVE DATE: April 18, 2017 <br />OWNER: Indian River County <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT/ EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001, AWARDED September 9.2014 <br />PROJECT: Park Place Water Services Replacement Proiect <br />COUNTY UTILITY PROJECT NO.: UCP #4133 CONTRACTOR'S PROJECT NO.: N/A <br />COUNTY WIP. No. <br />You are directed to proceed promptly with the following work: <br />Description: The project will consist of replacing approximately 102 single and double water services <br />serving the residences at Park Place Mobile Home Park located on Barber Street west of the FEC rail <br />road tracks. <br />Attachments: Attachment 3 <br />Method of determining Contract Price: <br />m Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of <br />County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. <br />M Lump Sum <br />m Cost of the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Labor Cost (rounded) _ <br />$76,234.54 <br />Estimated <br />90 days from NTP <br />Contract Time: <br />ACCEP <br />By. <br />Blue Goose Construction <br />Labo/r�C ntract r <br />Date: ' C j �l <br />RECOMCna <br />By: <br />ArjuP.E. <br />Capital Projects Manager <br />Date: fi-iln <br />APPROVED: <br />By: <br />COUNTY, CHAIRMAN <br />Joseph E. Flescher <br />Date: <br />FAUtilitieslUTILITY - Engincering\Projects - Utility Construction Permits\IRC-Park Place -4133\Work Authorization No. 2017-003.doe <br />P19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.