Laserfiche WebLink
BLUE Blue QUOTATION/ESTIMATE <br />GOOSE <br />Goose <br />construction <br />Heavy Civil Underground Utilities /Complete Site Development/ Marine <br />Project: PARK PLACE - WATER SERVICE REPLACEMENT PROJECT <br />To: Indian River County Utilities CONTACT: Steve. Bush <br />PHONE: 772-216-1873 <br />Date: February 11, 2017 EMAIL <br />IFLABOR <br />COSTS <br />Bid <br />Bid Item <br />Estimated <br />Unit of <br />Labor Unit <br />Total Labor <br />Item No. <br />Description <br />Quantity <br />Measure <br />Price <br />Price <br />71 <br />Mobilization, Demobilization, MOT <br />1 <br />10 <br />% <br />$6,300.38 <br />23 <br />Test Holes / Potholes <br />30 <br />EA. <br />$250.00 <br />$7,500.00 <br />Ola <br />Install 1" or 1-1/2"' pe or PVC Service Line <br />350 <br />LF <br />$4.80 <br />$1,680.00 <br />07a <br />Install 24" HDPE Directional Bore <br />600 <br />LF <br />$33.35 <br />$20,010.00 <br />18a <br />Install Water Service Single Short with 2" Saddle and <br />4 <br />EA. <br />$300.00 <br />$1,200.00 <br />Corp Stop at Main <br />18e <br />Install Water Service Double Short with 2" Saddle and <br />24 <br />EA. <br />$350.00 <br />$8,400.00 <br />Corp Stop at Main <br />18g <br />Install Water Service Single Long with 2" Saddle and Corp <br />5 <br />EA. <br />$425.00 <br />$2,125.00 <br />Stop at Main <br />Install Water Service Double Long with 2" Saddle and <br />18j <br />23 <br />EA. <br />$425.00 <br />$9,775.00 <br />Corp Stop at Main <br />181 <br />Install 2" service casing <br />18 <br />EA. <br />$400.00 <br />$7,200.00 <br />Install Asphalt Cement Replacement over full trench <br />67a <br />width including Base & Sub-grade Compacted to County <br />25 <br />TON <br />$45.00 <br />$1,125.00 <br />Specifications <br />79c <br />Remove Concrete Driveway <br />115 <br />SY <br />$10.00 <br />$1,150.00 <br />79d <br />Insatll Conceret Driveway <br />115 <br />SY <br />$19.50 <br />$2,242.50 <br />86a <br />Lawn Restoration (Topsoil & Sod) up to 12' Wide <br />265 <br />SY <br />$2.25 <br />$596.25 <br />Subtotal <br />SubtotalWater System Labor <br />$69,304.13 <br />Contingency <br />1 % 10% <br />$6,930.41 <br />Labor Total = <br />$76,234.54 <br />ATTACHMENT 3 <br />P21 <br />