Laserfiche WebLink
• 6911 Street as required for conform to intersection geometric <br />changes estimated at 850' in each direction on 69th street <br />17. Engineer will incorporate General Provisions provided by the County, and <br />prepare Special Provisions (Technical Specifications) in County Public Works <br />Department format. In addition to the technical specifications for proposed <br />materials and methods. Prepare unit price bid schedule with bid descriptions <br />describing the work for each bid item. Prepare technical specifications in MS <br />Word format. <br />18. Engineer will develop one engineer's opinion of construction cost at <br />approximately 90% milestone and make adjustments for final submittal. Cost <br />breakdown will match the bid schedule. <br />19. Perform field review of drawings to evaluate design with existing conditions. <br />Deliverables: <br />Drawings (90%) <br />(1 copy) — Full size and (3 copies) — Reduced size on bond <br />Drawings (Final Plans) <br />Specs <br />(1 Copy) on bond unbound, (1 copy) on CD each submittal <br />Opinion of Construction Cost in Bid Schedule Format at 90% and final <br />(1 Copy) on bond <br />Post Design Services <br />20. Attend Pre -Bid Conference <br />21. Engineer will respond to bidders' questions and assist with the preparation of <br />addenda. <br />Construction Services <br />22. To be determined (not included in this contract) <br />BCG INITIAL CLIENT INITIAL <br />Page 6 of 14 <br />P124 <br />