My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/23/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
05/23/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:41:22 PM
Creation date
7/17/2017 12:16:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/23/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Manager and Engineer of Record, Design Services, US 41 Venice Bypass, Florida <br />Department of Transportation, District 1, Sarasota County, FL: Mr. Neiman prepared the construction <br />plans for the widening of the US 41 Venice Bypass. His design included realignment and reconstruction of <br />the existing four -lane with six -lane urban typical sections. Design of a closed stormsewer system, and five <br />stormwater treatment facilities, community involvement, traffic volume studies and projections, roundabout <br />feasibility studies, coordination with utility owners and wetland impacts and mitigation were an integral part <br />of the project. Maintenance of traffic plans, signing and marking plans and traffic signal plans for five <br />signalized intersections with left turn phasing were also included in the scope of work. <br />W <br />P79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.