Laserfiche WebLink
Consultant Capabilities <br />Full Depth Reclamation (FDR) <br />FDR is very site sensitive and can even vary over the course of a single project. The key to a <br />successful FDR project is the amount of experience the designer has, and more experience <br />working with this technology is very advantages to the project. There is no substitute for actual <br />field experience. Bechtol Materials and Testing, and more specifically Mr. Stormant, brings the <br />experience of working with many agencies, on numerous projects, at a variety of locations, with <br />primary responsibility for mix design and lay -down testing and inspection, a partial list of projects <br />is presented below: <br />Volusia County <br />Palm Beach County <br />Flagler County <br />Polk County <br />St. Johns County <br />City of Tampa <br />Duval County <br />City of Palm Bay <br />Lake County <br />City of Dunedin <br />Jackson County <br />City of Gulfport <br />Pasco County <br />City of Kissimmee <br />Martin County <br />City of Orlando <br />Bay County <br />City of Northport <br />Charlotte County <br />City of Tamarac <br />Glades County <br />City of Bellaire <br />Osceola County <br />United States Navy <br />Manatee County <br />NASA <br />Hendry County <br />...and many more. <br />Street Modifications and Signals <br />Lassiter Transportation Group, Inc. (LTG) is a small business enterprise, fully licensed <br />engineering firm formed in 2002. LTG is proud to be pre -qualified with the Florida Department <br />of Transportation (FDOT) in all traffic engineering and transportation planning work groups <br />including studies, design, statistics, and planning. <br />FDOT Qualifications <br />3.1 <br />Minor Highway Design 7.1 <br />Signing, Pavement Marking, and <br />Channelization <br />6.1 <br />Traffic Engineering Studies 7.2 <br />Lighting <br />6.2 <br />Traffic Signal Timing -7.3 <br />Si nalization <br />6.3.1 <br />ITS Analysis and Design 13.3 <br />Policy Planning <br />6.3.2 <br />ITS Systems Implementation 13.4 <br />Systems Planning <br />6.3.3 <br />1 ITS Traffic Engineering and 13.5 <br />Systems Communications <br />Subarea/Corridor Planning <br />6.3.4 <br />ITS Software Development 13.6 <br />Land Planning/Engineering <br />13.7 <br />Transportation Statistics <br />ITS — Intelligent Transportation Svstems <br />41 <br />P91 <br />