Laserfiche WebLink
EXHIBIT A <br />WORK ORDER NO. 1 <br />INDIAN RIVER COUNTY LANDFILL <br />SEGMENT 3 CELL 2 EXPANSION, SEGMENT 2 PARTIAL CLOSURE, AND <br />LANDFILL GAS SYSTEM EXPANSION <br />PHASE I - MEETINGS, DESIGN DUE DILIGENCE, SURVEY, AND GEOTECHNICAL INVESTIGATION <br />This Work Order, when executed, shall be incorporated in and become part of the Agreement for <br />Engineering Consulting Services for Indian River County Landfill between Indian River County Solid <br />Waste Disposal District (SWDD) and CDM Smith Inc., (CONSULTANT), dated July 2017 <br />hereafter referred to as the CONTRACT. <br />BACKGROUND <br />The SWDD, the owner and operator of the Indian River County Landfill, has requested that <br />CONSULTANT prepare this Work Order to provide professional engineering services for the <br />proposed Class I Landfill Segment 3 Cell 2 expansion, partial closure of Segment 2, and expansion of <br />the landfill gas collection system (Project). The proposed new cell is Cell 2 of Segment 3 <br />(approximately 10.6 acres in size), as shown on Drawing No. 5 of the 20 -Year Permit Drawings <br />dated September 2015. Segment 3 Cell 2 will be located immediately to the east of the existing <br />Segment 3 Cell 1. The proposed partial closure of Segment 2 (approximately 25 acres in size) <br />includes closure of the Segment 1/Infill vertical expansion area and the final elevations of Segment <br />2, which has been historically been referred to as the Segment 2C area. Expansion of the landfill gas <br />system within Segment 2 is proposed to be constructed concurrently with the partial closure of <br />Segment 2 so that the final components can be installed prior to the closure cap being constructed. <br />This Project will be completed in multiple phases. Phase I includes evaluation of available <br />information and developing sufficient information to update/revise existing permit design <br />drawings and complete the final design and specifications that will be used for procurement. <br />Subsequent phases will include preparation of the final design and bid package, <br />permitting/regulatory agency support, bidding assistance, and engineering services during <br />construction. The Scope of Services for Phase I of this Project is described below: <br />SCOPE OF SERVICES <br />CONSULTANT will undertake the design, bidding, permitting, and engineering services during <br />construction of the Class I Landfill Segment 3 Cell 2 expansion, Segment 2 partial closure, and <br />landfill gas system expansion located at the Indian River County Landfill. The design will include <br />the Segment 3 Cell 2 bottom liner system, leachate collection and conveyance systems, and <br />stormwater management facilities; Segment 2 partial closure cap liner system and stormwater <br />management facilities, and the Segment 2 landfill gas system expansion. This scope of services <br />includes work necessary to revise the existing permit drawings as necessary and to prepare final <br />design drawings and specifications suitable for procurement of construction services by the SWDD. <br />Based on recent discussions with SWDD staff and our familiarity with the landfill site, the proposed <br />Scope of Services in this Work Order includes the following tasks: <br />A-1 <br />112046_Exh ibits.docx <br />