Laserfiche WebLink
6.05 Acceptance of Final Payment as Release. <br />A. The acceptance by the CONTRACTOR of final payment shall be and shall operate <br />as a release to the OWNER from all claims and all liability to the CONTRACTOR <br />other than claims in stated amounts as may be specifically excepted by the <br />CONTRACTOR for all things done or furnished in connection with the work <br />under this Contract and for every act and neglect of the OWNER and others <br />relating to or arising out of the work. Any payment, however, final or otherwise, <br />shall not release the CONTRACTOR or its sureties from any obligations under <br />the Contract Documents or the Public Construction Bond.///////// <br />ARTICLE 7 - INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, ani <br />paragraph 6.20 (Indemnification) of the General Conditions to <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce OWNER to enter into <br />following representations: <br />A. CONTRACTOR has examined <br />other related data identified in th <br />B. CONTRACTOR has visited the <br />general, local, and Site conditioi <br />Work. A/b/111r.. <br />C. CONTRACTOR is fa <br />Regulations that may <br />ly s;tj4'j, the <br />with <br />akes the <br />Documents and the <br />familiar with and is satisfied as to the <br />ost, progress, and performance of the <br />fieafas to all federal, state, and local Laws and <br />and performance of the Work. <br />D. CONTRACT >... h`Carefully 's died all: (1) reports of explorations and tests of <br />sir, `�'�s,. <br />subsurface con`i�tions ,�`t <br />a ",. ntig��ous to the Site and all drawings of physical conditions <br />U- � � <br />in r ,elating to st i su fi e -'or subsurface structures at or contiguous to the Site <br />je p1�Undergro } Facilities) which have been identified in the Supplementaryonditions as provided in paragraph 4.02 of the General Conditions and (2) reports and <br />(drawings!, za'ttlous Environmental Condition, if any, at the Site which have been <br />I'd t lfed n the S, pp ementary Conditions as provided in paragraph 4.06 of the General <br />E. CONT:{r;T:lRhas obtained and carefully studied (or assumes responsibility for having <br />NXIS\ <br />done so�ti� aadditional or supplementary examinations, investigations, explorations, tests, <br />studies, and data concerning conditions (surface, subsurface, and Underground Facilities) <br />at or contiguous to the Site which may affect cost, progress, or performance of the Work <br />or which relate to any aspect of the means, methods, techniques, sequences, and <br />procedures of construction to be employed by CONTRACTOR, including applying the <br />specific means, methods, techniques, sequences, and procedures of construction, if any, <br />expressly required by the Contract Documents to be employed by CONTRACTOR, and <br />safety precautions and programs incident thereto <br />F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />@BCL@D405FE1F <br />00520-5 <br />C:\Users\GRANIC-1WppData\Local\Temp\BCL Technologies\easyPDF 7\@BCL@D405FE1F\@BCL@D405FE1F.doc <br />P57 <br />