6.05 Acceptance of Final Payment as Release.
<br />A. The acceptance by the CONTRACTOR of final payment shall be and shall operate
<br />as a release to the OWNER from all claims and all liability to the CONTRACTOR
<br />other than claims in stated amounts as may be specifically excepted by the
<br />CONTRACTOR for all things done or furnished in connection with the work
<br />under this Contract and for every act and neglect of the OWNER and others
<br />relating to or arising out of the work. Any payment, however, final or otherwise,
<br />shall not release the CONTRACTOR or its sureties from any obligations under
<br />the Contract Documents or the Public Construction Bond./////////
<br />ARTICLE 7 - INDEMNIFICATION
<br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, ani
<br />paragraph 6.20 (Indemnification) of the General Conditions to
<br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS
<br />8.01 In order to induce OWNER to enter into
<br />following representations:
<br />A. CONTRACTOR has examined
<br />other related data identified in th
<br />B. CONTRACTOR has visited the
<br />general, local, and Site conditioi
<br />Work. A/b/111r..
<br />C. CONTRACTOR is fa
<br />Regulations that may
<br />ly s;tj4'j, the
<br />with
<br />akes the
<br />Documents and the
<br />familiar with and is satisfied as to the
<br />ost, progress, and performance of the
<br />fieafas to all federal, state, and local Laws and
<br />and performance of the Work.
<br />D. CONTRACT >... h`Carefully 's died all: (1) reports of explorations and tests of
<br />sir, `�'�s,.
<br />subsurface con`i�tions ,�`t
<br />a ",. ntig��ous to the Site and all drawings of physical conditions
<br />U- � �
<br />in r ,elating to st i su fi e -'or subsurface structures at or contiguous to the Site
<br />je p1�Undergro } Facilities) which have been identified in the Supplementaryonditions as provided in paragraph 4.02 of the General Conditions and (2) reports and
<br />(drawings!, za'ttlous Environmental Condition, if any, at the Site which have been
<br />I'd t lfed n the S, pp ementary Conditions as provided in paragraph 4.06 of the General
<br />E. CONT:{r;T:lRhas obtained and carefully studied (or assumes responsibility for having
<br />NXIS\
<br />done so�ti� aadditional or supplementary examinations, investigations, explorations, tests,
<br />studies, and data concerning conditions (surface, subsurface, and Underground Facilities)
<br />at or contiguous to the Site which may affect cost, progress, or performance of the Work
<br />or which relate to any aspect of the means, methods, techniques, sequences, and
<br />procedures of construction to be employed by CONTRACTOR, including applying the
<br />specific means, methods, techniques, sequences, and procedures of construction, if any,
<br />expressly required by the Contract Documents to be employed by CONTRACTOR, and
<br />safety precautions and programs incident thereto
<br />F. CONTRACTOR does not consider that any further examinations, investigations,
<br />explorations, tests, studies, or data are necessary for the performance of the Work at the