Laserfiche WebLink
MIR. - <br />Old Dixie Highway from 71st Street to CR51O <br />SCHEDULED <br />VALUE I <br />PREVIOUS APPLICATION <br />THIS PERIOD <br />TOTAL COMPLETED <br />% MATERIALS <br />BALANCE TO FINISH <br />I .UN .-dfflg <br />,NWN1 <br />MUn .hW <br />un .." ,, <br />� <br />� QuOY, a .. + <br />' A07au. .M.. <br />t J) Yl. <br />M r;Z .7S'{IS.. <br />.. .. � _ fl <br />, �`�' _ t..o_ .MO, <br />n B", <br />101-1 MOBILIZATION <br />IS <br />1 <br />$ 259,360.64 <br />259,360.64 <br />1.00 <br />259,360.66 <br />0100 <br />L00 <br />259,M. <br />0.00% <br />0.00 <br />0.00 <br />0.00 <br />102-1 MAINTENANCE OF TRAFFIC <br />LS <br />1 <br />25 78.00 <br />25,978. <br />1.00 <br />25978.00 <br />OAD <br />L00 <br />25,978.0 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />•1132-99 CHANGEABLE VARIABLE MESSAGE SIGN <br />PO <br />360 <br />$ 18.00 <br />6480.00 <br />454.00 <br />8172.00 <br />CIAO <br />454.00 <br />8,17200 <br />126.11% <br />0.00 <br />-94.00 <br />-1691 <br />°104.1 EROSIONANDWATER POLLUTION CONTROL <br />IS <br />1 <br />$ 26,000.00 <br />26000.00 <br />1011 <br />26000.00 <br />044 <br />L00 <br />26 0.00 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />l04-l"6601A•,.....�: LER BBim <br />4 <br />19-609 <br />am <br />. <br />BAD <br />BAB <br />BAO <br />BAB <br />B,BB96 <br />GAB <br />O,OB <br />.,n4 I8 K4kETMHTE6NO0J- BEkEi6 <br />64 <br />36 <br />BAB <br />BAB <br />489 <br />0.89 <br />9.0 <br />BA8 <br />BAD% <br />BAB <br />36.0 <br />0.00 <br />IID -1-1 CLEARING AND GRUBBING <br />AC <br />7 <br />$ 414200 <br />28,994.00 <br />7.00 <br />28,994.00 <br />O.CO <br />7.00 <br />28,994.00 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />110-7-1 MAILBOY, RELOCATION <br />EA <br />6 <br />$ 100.00 <br />600.00 <br />6.00 <br />600.00 <br />0.00 <br />6.00 <br />600.00 <br />100.00% <br />0.00 <br />0.00 <br />D.00 <br />12D-1 EXCAVATION EMBANKMENT <br />SY <br />10000 <br />S 4.25 <br />42,500.00 <br />10000.00 <br />42 OO.DD <br />0.00 <br />10,000-00 <br />42,500.00 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />BORROW EXCAVATION (MILUNGS) (RECLAIMED ASPHALT <br />120.2A PAVEMENT BASE (RAP) -MIXED IN ROADWAY BAS <br />CY <br />6,D00 <br />$ 15.00 <br />901000.00 <br />5,958.00 <br />89,370.00 <br />0.00 <br />5,958.00 <br />89 70.00 <br />9930% <br />0.00 <br />. <br />630.00 <br />160.4.1 TYPE -8"STABILIZATION 12' SUBGRADE LBR 40 SHOULDER <br />SY <br />9000 <br />4.60 <br />41,400.00 <br />8,100.00 <br />37,260.00 <br />0.00 <br />8,100.00 <br />37,260. <br />90.00% <br />0.00 <br />900.00 <br />4140.00 <br />2857 OPTIONAL BASE COURSE FULL DEPTH RECLAMATION <br />SY <br />38,842 <br />$ 5.16 <br />200,424.72 <br />38A93.00 <br />198623.88 <br />0.00 <br />38A93.00 <br />198,623.88 <br />99.10% <br />0.00 <br />349.00 <br />1ADO.84 <br />286.1 TURNOUT CONSTRUCTION(ASPHALT) <br />SY <br />500 <br />$ 27.00 <br />13,500.00 <br />319.08 <br />81615.15 <br />0.00 <br />319.08 <br />8,615.16 <br />63.82% <br />0.00 <br />IBM92 <br />4884.84 <br />226-2 TURNOUT CONSTRUCTION(CONCRETE) <br />SY <br />600 <br />$ 36.00 <br />21,600.00 <br />50.00 <br />1 0.00 <br />0.00 <br />50.00 <br />1,800.00 <br />833% <br />0.00 <br />550.00 <br />19 SOO.00 <br />ASPHALT EMULSION TYPE CSS-1h-OUANTTTY BASED ON 275 <br />300.1 GAL/SY <br />GA <br />106,815 <br />240 <br />256,M6.00 <br />58 649.00 <br />140,757.60 <br />0.00 <br />58 649.00 <br />140 75260 <br />54.91% <br />0.00 <br />48,16800 <br />11S,598. <br />327-704 MILLING EXISTING ASPHALT PAVEMENT I-11rAVG. DEPTH <br />SY <br />1,658 <br />$ 290 <br />4,808.20 <br />:4658.00 <br />4,80820 <br />0.00 <br />L658.00 <br />4808.20 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />SUPERPAVE ASPHALT CONCRETE, TRAFFIC C (S.P.125,1-1/2' <br />3341-13 THICK) <br />SY 1 <br />36,516 <br />$ 691 <br />ZW2.5.56 <br />35961.013 <br />24849051 <br />0.00 <br />3596L00 <br />24849051 <br />98.48% <br />0.00 <br />555.00 <br />3,835.05 <br />SUPERPAVE ASPHALT CONCRETE TRAFFIC C (S.P. 93,1-1/2' <br />334-1-M THICK) <br />SY <br />38,155 <br />1 $ 7.85 <br />299,51675 <br />36659.79 <br />287779.35 <br />0.00 <br />36659.79 <br />297,779.351 <br />96.08% <br />0.00 <br />3.495al <br />IL737A0 <br />MISCELLANEOUS ASPHALT PAVEMENT (3° THICK UNDER <br />339.1 GUARDRAI <br />TN <br />50 <br />$ 225.00 <br />11X0.00 <br />13.00 <br />2,925 <br />0.00 <br />13.00 <br />2,925,001 <br />26.00% <br />0.00 <br />37,00 <br />8325.00 <br />CONCRETE CLASS 11(8714' BOX CULVERT) (PRECAST) <br />400.2.1 (INCLUDES REINFORCING <br />LF <br />72 <br />$ 690.00 <br />49,680.0 <br />72.00 <br />49,660.00 <br />0.00 <br />7200 <br />49 680.00 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />CONCRETE, CLASS It (6'X3' BOX CULVERT) (PRECAST) <br />400.2-1A INCLUDES REINFORCING STEEL) <br />LF <br />72 <br />$ 669.00 <br />48,16800 <br />72.00 <br />48,168.00 <br />0.00 <br />72.00 <br />48,16800 <br />1D0.00% <br />0.00 <br />0.00 <br />0.00 <br />CULVERT) (F.D.O.T. INDEXB289) (INCLUDES REINFORCING <br />400-2-2 STEEL) <br />EA <br />2 <br />$ 37 17200 <br />64,344. <br />LOD <br />64,344.OD <br />0.00 <br />200 <br />64 .00 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />CULVERT) (F.D.O.T. INDEX 11289) (INCLUDES REINFORCING <br />404-2A STEEL) <br />EA <br />2 <br />IS 3L606.D0 <br />63,2=00 <br />2.00 <br />63,7M. <br />0.00 <br />200 <br />63,212.00 <br />160.00% <br />0.00 <br />0.00 <br />0.00 <br />4251-521 INLETS, DT BOT TYPE C.<10' <br />EA <br />20 <br />$ 1,522.00 <br />30,440.00 <br />20.00 <br />30440.00 <br />0.00 <br />20.00 <br />30,440.00 <br />IDD.00% <br />0.00 <br />0.00 <br />0.00 <br />475-1351 INLETS, OT BOT TYPE E, 410' <br />EA <br />8 <br />21100.00 <br />16800.00 <br />8.00 <br />16800.00 <br />0.00 <br />8.00 <br />16,800.00 <br />1110.00% <br />O.DO <br />0.00 <br />0.00 <br />430-174-112 PIPE CULVERT, ROUND, 12"SO CAP <br />LF <br />222 <br />$ 22.00 <br />4,884.00 <br />219.00 <br />4818.00 <br />OLD <br />219.00 <br />4,818.00 <br />9865% <br />0.00 <br />3.00 <br />66.00 <br />430-174-115 PIPE CULVERT, ROUND, LS" SD CAP) <br />LF <br />814 <br />$ 26.00 <br />21164.00 <br />ffi4.W <br />21164.00 <br />0.0 <br />814.00 <br />21,164.00 <br />100.00% <br />0.00 <br />0.00 <br />0.00 <br />430 -174 -MA PIPE CULVERT ROUND 15- SO (RCP) <br />lF <br />222 <br />4L57 <br />9,228.54 <br />224.00 <br />9311.68 <br />0.00 - <br />224.00 <br />9 SL68 <br />100.90% <br />0.00 <br />-2.00 <br />-83.14 <br />00 _-_-_____._-_..__.__________.-- ____.___...-__. .._______ ------ <br />4 <br />_ _ _ <br />