1. Progress payments will be made in an amount equal to the percentage indicated <br /> below, less the aggregate of payments previously made and less such amounts as <br /> ENGINEER may determine or OWNER may withhold, in accordance with paragraph <br /> 14.02 of the General Conditions: <br /> a. Ninety percent (90%) of Work completed (with the balance being retainage). <br /> There will be no payment for the cost of materials and equipment not incorporated <br /> in the Work but stored on the Project site. <br /> 6.03 Final Payment <br /> A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of <br /> the General Conditions, OWNER shall pay the remainder of the Contract Price as <br /> recommended by ENGINEER as provided in said paragraph 14.07. <br /> ARTICLE 7 - INDEMNIFICATION <br /> 7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br /> paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. <br /> ARTICLE 8 -CONTRACTOR'S REPRESENTATIONS <br /> 8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br /> following representations: <br /> A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br /> other related data identified in the Bidding Documents. <br /> B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br /> general, local, and Site conditions that may affect cost, progress, and performance of the <br /> Work. <br /> C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and <br /> Regulations that may affect cost, progress, and performance of the Work. <br /> D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br /> in or relating to existing surface or subsurface structures at or contiguous to the Site <br /> (except Underground Facilities) which have been identified as provided in paragraph 4.02 <br /> of the General Conditions and (2) reports and drawings of a Hazardous Environmental <br /> Condition, if any, at the Site which have been identified as provided in paragraph 4.06 of <br /> the General Conditions. <br /> E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br /> done so) all examinations, investigations, explorations, tests, studies, and data concerning <br /> conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site <br /> which may affect cost, progress, or performance of the Work or which relate to any aspect <br /> of the means, methods, techniques, sequences, and procedures of construction to be <br /> employed by CONTRACTOR, including applying the specific means, methods, <br /> techniques, sequences, and procedures of construction, if any, expressly required by the <br /> Contract Documents to be employed by CONTRACTOR, and safety precautions and <br /> programs incident thereto <br /> 00520-Agreement-ADDENDUM 1 <br /> 00520-3 <br /> F\Purchasing\Bids\2016-2017 FY(2017000)0017051 Osprey Acres Stormwater Park\00520-Agreement-ADDENDUM 1 doc Rev 05/01 <br />