Laserfiche WebLink
Work Order No. 14 — 45th Street <br />Beautification Phase U Improvements, <br />Indian River County <br />EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, finai designn documents are ex <br />to take approximately six (6) months from the Notice to Proceed (NTP). <br />NTP contingent upon BOCC approval <br />Initial Submittal (40% Design Drawings) <br />Interim Submittal (80% Design Drawings) <br />Final Submittal (100% Design Drawings) <br />lmonths following NTP <br />4months following NTP <br />6months following NTP <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 6 of 7 <br />