Laserfiche WebLink
Reimbursement: The COUNTY shall reimburse the DEVEI OPER pursuant to the provisions <br />of Section 201.11, of the Code, for funds advanced by DEVELOPER to oversize the off-site <br />facilities. COUNTY shall reimburse DEVELOPER in accordance with Exhibit "B" for oversizing <br />the off-site watermain. The actual reimbursement amounts shall be based on Exhibit B <br />but in no event shall the County cost share exceed $105,845.95. The reimbursements shall <br />follow the schedule outlined below: <br />1. Off-site watermain identified as Item IRC -1 in Exhibit B to be paid once completion of <br />all necessary testing, acceptance of Florida Department of Environmental Protection <br />(FDEP) Certification Of Completion, and acceptance of the watermain dedication to <br />Indian River County Department of Utility Services (IRCDUS) per (IRCDUS) Water & <br />Wastewater Utility Standards, December 2015 or latest edition. <br />2. Fifty percent (50%) of the remainder ($105,845.95 - $35,430.48) or $35,207.74 of the <br />off-site watermain to be paid when a minimum forty (41) building permits have been <br />issued and the remainder fifty percent (50%) or $35,207.73 to be paid when eighty (82) <br />building permits have been issued within the Lost Tree Preserve Plan Development. <br />B. 6 -inch Diameter Force Main west along the south side of 69th Street from the south west <br />corner of 69th Street and Old Dixie Highway to the west limits of the proposed turn lane <br />into Lost Tree Preserve Plan Development. A distance of approximately 1,700 linear feet: <br />The DEVELOPER shall furnish and install approximately 1,700 linear feet of 6" PVC and <br />appurtenance along the south side of 69th Street from the southwest corner of 69th Street <br />and Old Dixie Highway to the west limits of the turn lane into Lost Tree Preserve Plan <br />Development. <br />Reimbursement: COUNTY shall reimburse DEVELOPER in accordance with Exhibit "C" for <br />oversizing the off-site forcemain. The actual reimbursement amounts shall be based on <br />Exhibit C but in no event shall the County cost share exceed $44,471.28. The <br />reimbursements shall follow the schedule outlined below: <br />1. Fifty percent (50%) of the off-site forcemain to be paid when a minimum forty (41) <br />building permits have been issued and the remainder fifty percent (50%) to be paid <br />when eighty (82) building permits have been issued within the Lost Tree Preserve Plan <br />Development. <br />C. The COUNTY and DEVELOPER acknowledge that additions to this Agreement will be <br />necessary when future phases are contemplated. The 12" off-site water main and the 6" <br />force main on 69th Street will be extended to the western limits of Lost Tree Preserve Plan <br />Development when future phases of the project are constructed. The COUNTY and <br />DEVELOPER agree that the DEVELOPER will pay 67% of the construction costs of the water <br />main that abuts DEVELOPER property (Lost Tree Preserve Plan Development) with the COUNTY <br />\111 I1.11 II 4\I1111.11Y- I N(i1NE'E:RIN( i\I'I2UJ1.("IS II 11111 Y C1SNSIR( IC 11, 1N PI;I21,1I1'S\I.()SI 1121,1. PI21:SI-I2 VI' I'IIASF. 1-11�'I <br />-Page 2 - <br />UiU)I.V[LUPLI2S A(71211.MI'Nl\I)FV A(}RI FMI7N1 e•16 17 I)(1C <br />