My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/20/2017
CBCC
>
Meetings
>
2010's
>
2017
>
06/20/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:57:32 PM
Creation date
8/21/2017 11:46:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/20/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16. Surrounding Land Use and Zoning: <br />North: IRFWCD Ditch, 5th Street SW, Serenoa Subdivision / RS -6 <br />East: IRFWCD Lateral "J" Canal, Fox Ridge Subdivision (aka Timber Ridge Phase V) / RS -6 <br />South: 7th Street SW, Oslo Park Subdivision / RS -6 <br />West: 12th Avenue SW (to be abandoned), Osprey Marsh Nutrient Removal Facility / RS -6 <br />All conditions recommended by staff have been accepted by the applicant. <br />RECOMMENDATION <br />Based on the analysis above, staff recommends that the BCC grant special exception use approval for a <br />public limited utility facility to be known as the Osprey Acres Floway and Nature Preserve with the <br />following conditions: <br />1. Prior to issuance of land clearing and tree removal permits, the applicant shall: <br />a. Obtain Environmental Planning staff approval of the project's final tree protection plan, <br />and tree mitigation plan (if applicable). <br />b. Provide a copy of the project's gopher tortoise permit from the Florida Fish & Wildlife <br />Commission (if applicable). <br />2. Prior to site plan release, the applicant shall obtain approval of the requested right-of-way <br />abandonment of 12th Avenue SW or obtain a County right-of-way permit for the proposed <br />stormwater (force main) pipe connection between the Osprey Marsh Nutrient Removal Facility <br />and the subject project site. <br />ATTACHMENTS <br />1. Application <br />2. Excerpt from Draft June 8, 2017 PZC Minutes <br />3. Location and Zoning Map <br />4. Aerial <br />5. Site Plan <br />rol <br />P136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.