Laserfiche WebLink
D. Funding Sources (Round figures to the nearest dollar.) <br />The maximum FEMA share forRMGPprojects is 75%. The other 25% can be made up of State and Local funds as well as <br />in-kind services. The FMA program requires that the maximum in-kind match be no more than 12.5% of the total project <br />costs. HMGP/FMA funds may be packaged with other Federal funds, but other Federal funds (except for Federal funds that <br />lose their Federal identity at the State level such as CDBG and certain tribal funds) may not be used for the non -Federal share <br />of the costs. <br />Estimated FEMA Share $ 52,017 75 % of Total (maximum of 75%) <br />Non -Federal Share <br />Estimated Local Share $ 17,339 25 % of Total (Cash) <br />$ % of Total (In-kind*) <br />$ % of Total (Project Global Match**) <br />Global Match Project Title: <br />Other Agency Share $ % of Total' <br />(Identify Other Non -Federal Agency and availability date: ) <br />Total Funding sources from above $ 69,356 100 Total % (should equal 100%) <br />*identify proposed eligible activities directly related to project to be considered for In-kind services. (Note on Section B) <br />**Separate project application must be submitted for each project (Global) Match project <br />E. Project Milestones/Schedule of Work <br />List the major milestones in this project by providing an estimated time -line for the critical activities not to exceed a period of <br />3 years for performance, e.g. Designing, Engineering, Permitting, etc. These milestones should correspond with the scope of <br />work and budget. <br />Milestone <br />Mumher nfDays to Camnlete <br />[Example: Demolition of 6 structures and removal of debris <br />14 days] <br />County Advertisement, Selection and Award of Contract Bids <br />90 days <br />Engineering/Design of Structure Foundation <br />60 days <br />btain Building Permits <br />90 days <br />roject Mobilizati <br />30 days <br />tility Disconnects/Demolition of Existing Structure Foundation <br />30 days <br />xcavation of fill/ Installation of Lifting System/Elevation of Structure <br />60 days <br />oan/Inspect/Pour Concrete Pad Footings <br />30 days <br />Form/Inspect/Pour Tapered Concrete Piers <br />30 days <br />Lower Structure onto Foundation and Secure with Hurricane Tie -down Straps <br />30 days <br />Remove structure lifting system <br />30 days <br />Utility Re -connects <br />0 days <br />Clean, rough grade site, and demobilize <br />0 days <br />Surveys and Final Elevation Certificate <br />0 days <br />Final Inspections/Closeout <br />0 days <br />Bather Delays <br />0 days <br />Attach any continuations or additional items to this page <br />Form No. HMGP 001, Eff. 06/2012 <br />P44 <br />