My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/20/2017
CBCC
>
Meetings
>
2010's
>
2017
>
06/20/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:57:32 PM
Creation date
8/21/2017 11:46:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/20/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Steven Hitt <br />From: Jamison Brownie <jamison@browniecompanies.com> <br />Sent: Thursday, May 18, 2017 8:49 AM <br />To: Steven Hitt <br />Subject: Re: Emailing - Indian River County.7770 Jungle Trail.pdf <br />Steven, <br />I apologize for not getting this to you sooner. The figures I am associating with what I have in my proposal as <br />exclusions are only budget numbers they are not hard numbers. I would also add around 25% to these numbers <br />to allow for a general contractor to manage and coordinate the project. I hope this helps, please let me know if I <br />can be of further assistance. <br />Add 12 tapered concrete columns- $2,800.00 <br />Termite treatment -$750.00 <br />Density Tests -$350.00 <br />De -Watering- Time and material and only if it is needed. <br />Demolition (removal and haul away existing concrete foundation only) -$2,600.00 <br />Sill Beam Repairs -Unknown at this time. Can not determine until structure is elevated and might not be needed <br />at all. <br />Pilings- Unknown at this time. Need a soil investigative report/ soils report to determine if the existing <br />subsurface ground conditions are suitable to support the existing structure. <br />Site Prep -Unknown without fiuther information of final site plan. <br />Dumpsters- $450.00 per dumpster. <br />Utility Disconnects and Re -connects -$3,500.00 <br />Surveys and Final Elevation Certificate -$2,500.00 <br />Thank You, <br />Jamison Brownie <br />Cell -772-260-3799 <br />Office -772-460-5660 <br />Fax -772-460-5650 <br />j amison&browniecompanies. com <br />www.browniecompanies.com <br />On May 2, 2017, at 12:05 PM, Steven Hitt <shitt(a,irc og v.com> wrote: <br />Good Afternoon Jamison, <br />Sorry it has taken so long for me to get back with you to thank you for the estimate. I have passed this <br />along to other departments and actually wanted to know if it would be possible to update the estimate <br />to include the foundation option with all 36 piers being tapered piers instead having any CMU piers. <br />Also, our public works department wanted to see the estimate include the costs for those things that <br />were listed as exclusions. Please let me know if you have any questions. <br />1 <br />P46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.