My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/08/2014 (3)
CBCC
>
Meetings
>
2010's
>
2014
>
07/08/2014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:09:29 PM
Creation date
8/29/2017 4:18:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/08/2014
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />S� <br />TO: <br />THROUGH: <br />FROM: <br />SUBJECT: <br />DATE: <br />Joseph A. Baird, <br />County Administrator <br />Christopher R. Mora, P.E. cy.". <br />Public Works Director <br />James D. Gray, Jr. <br />Coastal Engineer <br />CONSEN <br />Award of Bid No. 2014037 <br />Sector 3 Dune Repair — IRC Project No. 0928 - A <br />June 27, 2014 <br />DESCRIPTION AND CONDITIONS <br />The proposed project award is for a construction contract between the County and <br />Guettler Brothers Construction, LLC. (GBC) for the repair of the Sector 3 Beach and Dune <br />Restoration Project constructed between 2010 and 2012. <br />Following the passage of Hurricane Sandy (October, 2012) the Sector 3 project area <br />sustained damages to the dunes and is need of repair to maintain protection to upland <br />properties and infrastructure from future storm events. The proposed project will repair <br />approximately 31,000 feet of storm damaged dunes by placing approximately 154,700 <br />cubic yards of beach compatible sand landward of the mean high water line (MHWL). <br />On May 14, 2014, the County advertised the project, soliciting bids to repair the dunes <br />from either an offshore sand borrow source or from upland sand sources identified in the <br />Florida Department of Environmental Protection (FDEP) Permit. <br />The bid opening was held on June 16, 2014. Nine (9) bids were received and opened. <br />Upon review, all bidders submitted a bid identifying use of an Upland sand source, with <br />one bidder, Blue Goose Construction, electing to submit separate bids using either an <br />Upland or Offshore sand source. All supporting bid documents are on file and available <br />for viewing in the Public Words Department. A detailed bid tabulation is as follows: <br />F:\Public Works\JamesG\Sector 3 Repair Project\Bid Evaluation\Notice of Award\agenda item - Contract Award Recommendation - <br />Guettler Brothers Construction - Sector 3 Dune Repair Project - 7-8-14.docx <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.