My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/08/2014 (3)
CBCC
>
Meetings
>
2010's
>
2014
>
07/08/2014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:09:29 PM
Creation date
8/29/2017 4:18:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/08/2014
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW, THEREFORE, in consideration of these premises, and other good and valuable <br />consideration, the receipt and sufficiency of which are hereby acknowledged, the parties <br />hereto, intending to be legally bound, covenant and agree to amend the Contract as follows: <br />1. The existing Article 1 — SCOPE OF WORK of the Contract is modified to include the <br />following: <br />MATERIAL RECOVERY FACILITY (MRF) IMPROVEMENTS. The Contractor shall <br />undertake and complete Improvements to the landfill MRF building as detailed below: <br />1) SWDD will direct purchase Ninety -Eight (98) Full Enviro-Block Unit and Four (4) <br />Half Enviro-Block Unit from inter -Block Retaining System, Inc. for delivery to the <br />landfill MRF, specifically the paper building. <br />2) Contractor will provide Labor which includes: unloading freight and stacking <br />blocks. <br />3) Contractor will provide for the construction and installation of the push wall into <br />the paper building. Installation of 6" x 6" x 1/2" metal angle, anchored with 1/2" <br />x 7.5" concrete anchor's to concrete floor of metal building to prevent the blocks <br />from sliding on the floor surface. This work includes providing any miscellaneous <br />equipment, supplies and parts. <br />4) Contractor, through its subcontractor, will repair the entry way into the paper <br />recycling building by furnishing all labor and material in constructing a 16' x 20' x <br />7" concrete apron with a minimum of 5,000 psi concrete and #5 Rebar 12" on <br />center each way with saw cut control joints. <br />5) SWDD shall be responsible for applying for and obtaining all necessary permits <br />and approvals, if any, in connection with the MRF improvements listed above. <br />2. The existing Article 2 -- TERM OF CONTRACT is modified to include the following: <br />v) The Contractor shall use commercially reasonable efforts to complete the MRF <br />Improvement Project at the landfill within 30 calendar days from the delivery of <br />all the blocks to the IRC Landfill and no later than 90 calendar days from the <br />Notice to Proceed. Any change in contract time shall be based on authorized and <br />approved basis. <br />3. The existing Article 3 — COMPENSATION of the Contract is modified to include the <br />following: <br />xv) Payment for the MRF Improvement Project at the landfill shall not exceed <br />$18,207.10 as provided in the proposal by Contractor in Exhibit #1. <br />4. The background recitals are true and correct and form a material part of the <br />Amendment. <br />5. All terms and provisions of the Contract not amended by this Amendment shall be and <br />remain in full force and effect. <br />67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.