My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-129
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2017 11:10:24 AM
Creation date
9/13/2017 11:07:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
09/12/2017
Control Number
2017-129
Agenda Item Number
15.B.1.
Entity Name
Republic Services
Subject
Tenth Amendment to Contract Agreement with SWDD
Operations and Maintenance
SWDD Landfill and Customer Convenience Centers
SCS Field Services
Horizontal Landfill Gas Collectors
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brian Lewis <br /> August 23, 2017 <br /> Page 2 <br /> 3 feet at wellhead riser and maximum trench depth will be 16 feet at a 3 to 5 percent slope to allow <br /> condensate to drain back into the waste. Solid lateral piping for both the collector and vacuum lines <br /> will be bedded with 6- inches of compacted sand. The vacuum lateral for HC-1701N will tie into the <br /> existing riser at HP-14 and the vacuum lateral for HC-1701S will tie into the existing riser at EW-6. <br /> SCS-FS will install new 2-inch Landtec wellheads, flex hose and rubber couplings to connect the <br /> horizontal collectors to the vacuum laterals. All trench spoils will be backfilled into the trench or <br /> deposited on the active working face. <br /> Task Two: Abandonment of Existing Vertical and Horizontal <br /> Collectors <br /> SCS-FS will provide labor, equipment and materials to abandon the following vertical and horizontal <br /> collectors in the active cell: <br /> EW-6, EW-7, EW-8, A-2, A-3, HP-9, HP-10, HP-11, HP-12,HP-13, HP-14 <br /> All PVC wells will be capped with schedule 80 PVC caps using PVC cement and all HDPE lines will <br /> be capped with HDPE caps using butt or electrofusion equipment(this includes gas well, vacuum <br /> line and air or force main piping as applicable at each location). The vacuum lateral riser at well <br /> EW-6 and collector HP-14 will be left as vacuum risers and capped with flange adapters and blind <br /> flanges. <br /> Task Three: As Built Survey <br /> If requested, SCS-FS will provide a surveyor to collect an As-built survey of the new horizontal <br /> collectors and vacuum lateral piping. This work will be performed on a time and materials basis <br /> using our current MSA rates and standard mark-ups. <br /> COMPENSATION <br /> Task One—SCS will provide the services described in Task One for a lump sum fee of$55,000. <br /> Task Two—SCS will provide the services described in Task Two for a lump sum fee of$14,500. <br /> Task Three—Time and Materials. <br /> Total Lump Sum Cost—Two (2)Tasks combined is a lump sum fee of$69,500. <br /> Thank you for the opportunity to prepare this proposal; we welcome the chance to provide our <br /> services to Republic Services. Please contact Brian Basconi at(401)486-4897 if you have questions <br /> or need more information. <br /> Sincerely, <br /> Brian Basconi Gregory E. Hansen <br /> Project Manager Project Manager <br /> SCS FIELD SERVICES SCS FIELD SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.