My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/11/2017
CBCC
>
Meetings
>
2010's
>
2017
>
07/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 2:07:56 PM
Creation date
9/14/2017 10:28:42 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/11/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
543
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docket No. 170077 -EQ <br />Date: June 29, 2017 <br />FLORIBA POWER & LIGHT COMPANY <br />(Continued from Sheet No. 9.034) <br />Electricity Production and Plant Maintenance Schedule <br />Seconal Revised Sheet No. 9.03S <br />Cancels First Sheet No. 9.03S <br />Attachment A <br />Page 8 of 42 <br />8.1 During the tam of this Conbact, no later titan sixty (60) days prior to the Capacity Delivery Date and prior to April t of each <br />calendar year (hereafter, the QS shall submit to FPL in writing a detailed plan oC (a) the amount of firm capacity and rnetgy to be generated <br />by the Facility and delivered to the Delivery Point for each month of the following calendar year, ami (b) the tires, duration and magnitude of <br />any scheduled maintenance periods) and any anticipated reductions in capacity. <br />8.2 By October 31 of each calendar year. FPL shall notify the QS in writing whether the requested scheduled maintenance periods <br />in the detailed plat are acceptable. if FPL objects to any of the requested scheduled maintenance periods, FPL shall advise the QS of One time <br />period closest to the requested period(s) when the outage(s) can be scheduled The QS shall schedule maintenance outages only during <br />periods approved by FPL, such approval not tmreasombly withheld One: the schedule for maintenance has been established and approved <br />by FPL, either Party may request a subsequent change in such schedule and, except when such event is dux to Force Mgjcurc, request <br />approval for such change from the other Party, such approval not to be unreasonably withheld or delayed Scheduled mainterumoe outage <br />days shall be limited to uvea (7) days per calender year unless (he momufactura's wootmnaidation of maintenance outage days for the <br />technology and equipment used by the Facility exceeds such 7 day period, Provided, such number of days is considered taasonoble by <br />prudent industry standards and does not exceed two (2) fourteen (14) day intervals, one in the Spring and uric in the Fall, in any calendar <br />year. The scheduled maintenance outage days applicable for the QS at _ days in the Spring and T days in the Feil of emb calendar <br />year, provided tine conditions specified in the previous sentene are satisfied. in no event shall maintenance periods be scheduled during the <br />following periods: lune 1 thnwhgh and including October 31 st and December I through and 'including February 28 (or 29® its the case may <br />be). <br />8.3 The QS shag comply with reasonable requests by FPL regarding do) -today and hour -by -hour communication between the <br />Parties relative to electricity production and maintenance scheduling. <br />8.4 Dispatch and control <br />8.4.1 The power supplied by the QS hereunder shall be in the form of three-phase 60 Hertz alternating currant, at a noatinai <br />operating voltage of ,1100 volts ( kV) and power factor dispatchable and contmllabk in the range of 85% hhgging to <br />85% leading as measured at the Delivery Point to maintain system operating parmnetcM as specified by FPL. <br />8.42 At of times during the tam of this Contract, the QS shall operate and maintain the Facility(a) in mch s manneres to ensure <br />compliance with its obligations hereunder, in accordance with prudent engineering and operating practices and applicable law, and (b) with <br />all system protective equipment in service whenever the Facility is connected to, or is operated in parallel with, FPL's system The QS shall <br />install at the Facility those system protection and control devices necessary to ensure safe and protected operation of all energized equipment <br />during normal testing and repair. The QS shall have qualified personnel test and calibrate all protective equipment at regular intervals in <br />accordance with good mgineaing and operating p=rices. A unit functional trip (est shall be performed after each overhaul of the Facility's <br />turbine, generator or boilers and the results shall be provided to FPL prior to rewwft the Facility to service. The specifies of the unit <br />functional trip test will be consistent with good engineering and operating pretties. <br />8.4.3 If the Facility is separated from the FPL system for any reason, under no circumstances sholl the QS reconnect the Facility <br />into FPL's system without fast obtaining FPL's prior written approval. <br />8AA During the tern of this Contract, the QS shall employ qualified personnel for managing, operating and maintaining the <br />Facility and.for coordinating such with FPL. If the Facility tuts a Committed Capacity greater than 10 MW then, the QS shall ensure Owl <br />operating personnel are on duty at all tinics, twenty-four (24) hours a calendar day and seven (7) calendar days a week. If the Facility has a <br />Committed Capacity equal to or less than 10 MW Oven the QS shall ensure that operating personnel aro on duty at least Opt (8) hours per <br />day from 8 AM EST to 5 PM EST from Monday to Friday, with an operator on call at all other hours. <br />8.4.5 FPL shall at oil times be excused from its obligation to purchase and receive energy and capacity hereunder, and FPL shall <br />have the ability to require the QS to curbil or reduce deliveries of energy, to the extant necessary (a) to maintain the reliability and integrity <br />of any part of FPL's system, (b) in the event that FPL ddermines that a false to do so is Ucly to endanger life or property, or (e) is Neely to <br />result in significant disruption of electric service to FPL's customers. FPL shall give the QS prior notice, if practicable, of its intent to refuse, <br />curtail or reduce FPL's acceptance of energy and firm capacity pursuant to this Section mid will act to minimize the frequency and duration <br />of such occurrences <br />(Continued on Shoot Na 9A36) <br />Issued by: S. EL Romig, Director, Rates and Tariffs <br />Effective: September 13; 2016 <br />-13- <br />113-62 `1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.