My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/11/2017
CBCC
>
Meetings
>
2010's
>
2017
>
07/11/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 2:07:56 PM
Creation date
9/14/2017 10:28:42 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/11/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
543
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docket No. 170077 -EQ <br />Date: June 29, 2017 <br />FLORIDA POWER& LIGHTCOMPANY <br />Second Revised Sheet No. 10.313 <br />Cancels First Revised Sheet Na. 10.313 <br />Attachment A <br />Page 36 of 42 <br />APPENDIX B <br />TO TETE STANDARD OFFER CIDNPRACr <br />FOR TH E PURC HM OF FMI CAPACITY AND VMtGV <br />FROM RENEWABLE ENERGY FACILITIES <br />OR QUALIFYING FACILITIES WITH A DESIGN CAPACITY OF 100 KW OR LESS <br />PAY FOR PERFORMANCE PROVISIONS MONBHLYCAPACITY PAYMENT CALCULATION <br />I. MmthlyCapacity Paymaitc (MCP) foreach Monthly Biilieg Period shall be computed aomrdmg tithe fellaaing: <br />A. In the event that the Annual Capacity Billing Fodor ("ACBF"), as defined below. is less than 110%, thin no Monthly (opacity Payment shall be <br />duo That is: <br />MCP -0 <br />B. In the event that the ACBF is evil to or greater than WS/6 hat leas than 940/b, than the Monthly Capacity Payment dall be calculated by using <br />the following formula: <br />MCP - BCP x [I n4x(ACBF = 9495)] xCC <br />C. In the event that the ACBF is,equd to or greater than 94N, then the Monthly Capacity Payment shell be calculated by using the following <br />formula: <br />MCP-BCPxCC <br />Whoa <br />MCP - Monthly Capacity Payment indollarL <br />BCP - Rose Capacity Payment inS/KW/Montbasspecified in'FPL'sRare SchedaleQS-2. <br />CC - ComminedC.apacity in KW. <br />ACBF - Annual Capacity Staling Factor. TMs factor is calculated using the 12 months idling average of the Monthly Capacity <br />Factor. This 12 month rolling average shalt be defined as the sum of the 12 consecutive Monthly Capacity Factors <br />preceding the dole of calculation, divided by 12. During the first 12 consecutive Moodily Billing Periods, corn ing <br />with the fast Monthly Billing Period in which Capacity payments are to be made, tie calculation of the Annual <br />Capacity Billing Factor shall ba perfarmed as fallmws: (a) during the first Monthly Billing Period the Anneal Capacity <br />Sidling Factor shall be equal to the Monody Capacity Factor. (b) thereafter. the calculatioin attic Amens Capacity <br />Billing Factor shall be computed by dividing the sum of the Monthly Capaciy Factors during the first year's Monthly <br />Billing Periods in which Capacity payments are to he made by. the number of Monthly Billing Periods which have <br />dapsed. This calculation shag be performed at the end of tach Monthly Billing Period until enough Monthly Billing <br />Periods huvc dapsod to calculate a tine 12 -month rolling average Annual Capacity Billing Factor. Periods during <br />which the Facility has temporarily std its Committed Capacity equal to 0 KW due to a Force Mgjcuin avant pursuant to <br />Section 16 shall beeMaded from theapplicable capacity factor calculatim. . <br />MCF - Monthly Capacity Factor.: no sunr:o6 (i) the Hourly Factor of the Non -Dispatch Hours Plus (10'the Hourly <br />Factors of the Dispatch Hours or the Hourly factors of the hours when FPL requested reduced ddiwxies pursuant to <br />Sections SAA and SAS (Reduced Delivery Hour), divided by the numbcrof hours in the Monthly Billing Period. <br />HFNDH Hourly Factor ofa Non -Dispatch Hour. The energy received during the hour divided by the Committed Capacity. <br />For purposes of calculating the Hourly Fodor of a Non -Dispatch Hour the energy received shall not etioeed the <br />Committed Capacity. <br />HFDH Hourly Fetor of a Dispatch Hour or a Reduced.Detivery Hour. The scheduled energy received divided by the <br />scheduled energy roqucsto t . For purposca ofcalculating the Howdy Factor ofa Dispatch Houror the Howdy Factor <br />ofa Reduced Delivery Hour the scheduled energy received shall not exceed the scheduled energy requested. <br />Chi-PeAk Hours Those hours occurring April I thtmgh October 31 Mondays through Fridays, from 12 noon to 9:00 p.m. excluding <br />Memorial Day, Independence Day and Labor Day, and November 1 through March 31 Mondays through Fridays <br />from 6:00 a.m. to t0:00 a.m. and 6:00 p.m. to 10:00 p.m. prevailing Eastern fime excluding Thanksgiving Day, <br />Christmas Day and New Years Day. FPL shall have tate right to change such Orr Peak Hours by providing the QS <br />ominimum ofthirtvcalatdardays advanocnation. <br />Monody Billing - The period beginning an the first calendarday of each calendar month, except that the initial Monthly Billing <br />Period Period shall consist of the periodbeginning 12.01 a.m. on the Capacity Delivery Period Date and ending with <br />the last calendar day of sucb month. <br />Scheduled Energy, and Dispatch Hours are as defined in Section SAJ of the Standard OfferContract. <br />Issued by: S. E. Romig, Director, Rates and .Tariffs <br />Effective. August27,2015 <br />-41- <br />13-4�7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.