Docket No. 170077 -EQ <br />Date: June 29, 2017 <br />Attachment A <br />Page 40 of 42 <br />FLORIDA POWER & LIGHT COMPANY Original Sheet No. 10.317 <br />(Continued from Shcet No.10316) <br />IV. PLANT DISPATCHABIITY/CONTROLLABE STV <br />• Piovide the following operating characteristics and a detailed explanation supporting the performance capabilities indicated. <br />• Ramp Rate (MWAninute) <br />• Peak Capability (% above: Committed Capacity) <br />a Kmimumpower level (%ofCommiuedCapacity) <br />• Facility Turnaround Tune, Hot to Hot (hours) <br />• Start-up Time 6om Cold Shutdown (hours) <br />• Unit Cycling (43 cycleslyr) <br />• MW and MVAR Control (AGC, Manuel, Other (please explain)) <br />V. SrMGAND ]LICENSING <br />• Provide a licensmglocanittmg milestone schedule which lists all permits, licenses and variances required to site the Facility. <br />The milestone schedule spall also identify key milestone dates for baseline monitoring, application preparation, agency review, <br />certification and licensing/siting board approval, and agency permitism anot <br />• Provide a iicensingipamitting plan that addresses the issues of air emissions, water use, wastewater discharge, wetlands, <br />endangered species, protected properties, solid waste, surrounding lamp use, zoning for the Facility, associated Gann facilities, <br />and support of and opposition to the Facility. <br />• List the amission/epluent discharge limits the Facility will matt, and describe in detail the pollniion control equipment to be <br />used to meet time limits <br />VL FACIIMDEVELOPMENT AND PERFORMANCE <br />• Submit a derailed engineering, procununent, construction, startup and commercial operation schedule. The schedule shall <br />include milestones for site acquisition, enp¢neming phases, selection of &e major equipment vendors, architect engineer. EPC <br />contractor, and Facility operator, steam host integration, and delivery of majorequipment A discussion of the current status of <br />each milestone should also be included where applicable. <br />• Attach a diagram of the power block arrangement Provide a list of the major equipment vendors and the name and model <br />number of the major equipment to be installed. <br />• Provide a detailed description of the proposed environmental control technology for the Facility and describe the capabilities <br />of the proposed technology. <br />• Attach pr4kninary flow diagrams for the steam system, water system, and fuel system, and a main electrical one line diagram <br />for the Facility. <br />• State the expected heat rate (HFfV) at 75 degrees Fahrenheit for loads of IWA 7S%, and VW In addition, attachit <br />p relimbun heat balance for the Facility. <br />• [NOTE: add any requirements related to demonstrating that the facility meets the requhments under the statute or applicable <br />rules] <br />(Continued on Shoat No. 10.318) <br />Issued by: & E., Romig, Director, Rates and Tariffs <br />Effective: May ZZ, 2007 <br />- 45 - <br />Is -341 <br />