Laserfiche WebLink
connection with the performance of this Contract. Upon such termination Contractor shall be <br />entitled to payment only as follows: <br />(1) the actual cost of the work completed in conformity with this Contract and the specifications; <br />plus, <br />(2) such other costs actually incurred by CONTRACTOR as are permitted by the prime contract <br />and approved by the OWNER. <br />Contractor shall not be entitled to any other claim for compensation or damages against the County <br />in the event of such termination. <br />10 <br />