My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-109A
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-109A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2017 12:41:43 PM
Creation date
9/20/2017 12:37:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/15/2017
Control Number
2017-109A
Agenda Item Number
8.P.
Entity Name
Go Line Bus Turn-Off CR510
Subject
North County Bus Hub Site Work
Area
90th Avenue
Project Number
IRC-1715
Bid Number
2017060
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. the Work is defective, or completed <br />Work has been damaged, requiring <br />correction or replacement; <br />b. the Contract Price has been reduced <br />by Written Amendment or Change Orders; <br />c. OWNER has been required to correct <br />defective Work or complete Work in accor- <br />dance with paragraph 13.09; or <br />C. Payment Becomes Due <br />D. Reduction in Payment <br />1. OWNER may refuse to make <br />payment of the full amount recommended by <br />ENGINEER because: <br />a. claims have been made against <br />OWNER on account of CONTRACTOR's <br />performance or furnishing of the Work; <br />b. Liens have been filed in connection <br />with the Work, except where <br />CONTRACTOR has delivered a specific <br />Bond satisfactory to OWNER to secure the <br />satisfaction and discharge of such Liens; <br />c. there are other items entitling OWN- <br />ER to a set-off against the amount <br />recommended; or <br />d. OWNER has actual knowledge of the <br />occurrence of any of the events enumerated <br />in paragraphs 14.02.B.5.a through <br />14.02.B.5.c or paragraph 15.02.A. <br />2. If OWNER refuses to make payment <br />of the full amount recommended by <br />ENGINEER, OWNER must give <br />CONTRACTOR immediate written notice (with <br />a copy to ENGINEER) stating the reasons for <br />such action and promptly pay CONTRACTOR <br />any amount remaining after deduction of the <br />amount so withheld. OWNER shall promptly <br />pay CONTRACTOR the amount so withheld, or <br />any adjustment thereto agreed to by OWNER <br />and CONTRACTOR, when CONTRACTOR <br />corrects to OWNER's satisfaction the reasons <br />for such action. <br />3. If it is subsequently determined that <br />OWNER's refusal of payment was not justified, <br />the amount wrongfully withheld shall be treated <br />as an amount due as determined by paragraph <br />14.02.C.1. <br />14.03 CONTRACTOR's Warranty of Title <br />A. CONTRACTOR warrants and guarantees <br />that title to all Work, materials, and equipment covered <br />by any Application for Payment, whether incorporated <br />in the Project or not, will pass to OWNER no later than <br />the time of payment free and clear of all Liens. <br />14.04 Substantial Completion <br />A. When CONTRACTOR considers the entire <br />Work ready for its intended use CONTRACTOR shall <br />notify OWNER and ENGINEER in writing that the <br />entire Work is substantially complete (except for items <br />specifically listed by CONTRACTOR as incomplete) <br />and request that ENGINEER issue a certificate of <br />Substantial Completion. Promptly thereafter, <br />OWNER, CONTRACTOR, and ENGINEER shall <br />make an inspection of the Work to determine the <br />status of completion. If ENGINEER does not consider <br />the Work substantially complete, ENGINEER will <br />notify CONTRACTOR in writing giving the reasons <br />therefore. If €AI,GINIE€R Gensider-s the We* <br />substantially GOMplete, ENGINEER will prepare +nrl <br />Gempletion whiGh shall fix the date of Subst—a <br />'_ tentative list of items to he nmmpleted nr nnrrenierl <br />befGFe final payment. C W,tIFER nhal c sevens days <br />aaaka—wwittenobjestien to ENGINEER as t4a aT;p <br />GeesideFing-GUG; objestien s, ENGINEER nn � <br />that the Worm is not substantially—GeFnplete-, <br />ENGINEER will within 14 da after submission of the <br />in wFi _statiRgthe Feasens -therefor—lf, a#eF <br />GGRS <br />ation of OWNER's objeCitio„S, EPltvirrc€R <br />€Nr€R�c'll-v•thninrSa,s 14 days eie6xto�aRv€mm <br />delbveF <br />rertifinate of Substantial Gemnletion (with a Fe <br />iserl <br />tei;tatove lost of items to be GGImpleted GF GGIFFeGtedd) <br />reflentinn S Gh nhannes from the tentative oertifinote <br />as ENGINEER belmeyes justified after Gensideratie <br />00700 - General Conditions REV 5-10-13 <br />00700-40 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1715 Go -Line Bus Tum -Off (90th Avenue)\1-Admin\Bid Documents\Master Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.