My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-109A
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-109A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2017 12:41:43 PM
Creation date
9/20/2017 12:37:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/15/2017
Control Number
2017-109A
Agenda Item Number
8.P.
Entity Name
Go Line Bus Turn-Off CR510
Subject
North County Bus Hub Site Work
Area
90th Avenue
Project Number
IRC-1715
Bid Number
2017060
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: 20 <br />OWNER: Indian River County <br />CONTRACTOR - <br />CONTRACT FOR: GO -LINE BUS TURN-OFF CR 510 (901th AVENUE) <br />Project No.: IRC -1715 <br />OWNER's Bid No. 2017060 <br />Project Description: The project consists of site work for the construction of the North <br />County Bus Hub. The site work includes earthwork, pavement, concrete bus shelter <br />pads, sidewalk reconstruction, stormwater pipe installation, striping and signage <br />necessary for the project. <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />To - <br />OWNER <br />And T <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar <br />days of the above date of Substantial Completion. <br />00630 - Certificate of substantial Completion REV 04-07 <br />00630-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1715 Go -Line Bus Turn -Off (90th Avenue)\1-Admin\Bid Documents\Master Contract Documents\00630 -Certificate of <br />Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.