My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/18/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
07/18/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2017 12:49:20 PM
Creation date
9/25/2017 12:35:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/18/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
537
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Army Corps of Engineers (USACE) staff (completed by Conservation staff); preparation of <br />permit application and follow up response to data requests (by Conservation and GIS staff). As <br />these facilities will traverse existing wetlands, there will be additional coordination with <br />permitting agencies to address specific criteria. Therefore, the cost for completing this work using <br />outside consulting services would range between $5,500 to $8,000. <br />➢ Staff is working with GIS to produce the maps necessary to make application to SJRWMD. <br />Indian River Lagoon Greenway <br />➢ Staff has applied for FWC funding ($10,000 has been allocated by FWC— no County match) to <br />treat exotics on this conservation area. Staff received notification that this funding will be <br />provided, and a pre-bid meeting was held on June 28, 2017 by FWC (bids are all processed <br />through FWC). Once the purchase order has been issued, the FWC selected contractor will begin <br />work which is expected to begin Fall/Winter 2017. <br />Jones 'Pier Conservation Area: <br />➢ Work Order #5 for engineering services for MBV was approved. The work order will provide for <br />the development of site plans for Hallstrom Farmstead, Jones' Pier and the Kroegel Homestead. <br />Staff is coordinating with MBV in the development of this plan. Survey work is underway. <br />➢ Staff completed the wetland delineation for the site, and received approval of this delineation <br />from the Water Management District (WMD). Staff is working with GIS to provide the <br />coordinates for the wetland boundaries as part of the site planning process <br />➢ With Commissioner Solari's input, staff has created a walking trail that is now part of the rotation <br />for mowing and maintenance. <br />➢ Staff has installed water level monitoring wells to evaluate the groundwater conditions as part of <br />the site planning process. This data is collected monthly. <br />➢ Staff applied for a Department of Historical Resources (DI -IR) Small Matching Grant to restore <br />the Fruit Stand along Jungle Trail, and to create educational signage for conservation areas and <br />other strategic locations to promote the County's conservation efforts. The grant was submitted on <br />April 28th and the amount requested for the grant was $55,100 (the County's portion included <br />$17,050 in cash & $10,050 in in-kind services). This project works to meet the objectives <br />outlined in the Board Approved Management Plan and requirements under the Florida <br />Committees Trust grant agreement. <br />➢ Staff submitted an IRLNEP grant application to receive funds to assist in development of a <br />restoration plan for wetlands on-site. As part of the Master Plan, there will be impacts to <br />jurisdictional wetlands that will have to be off -set, therefore, the grant will be used to help <br />partially fund the design of a wetland restoration plan for the site that will be required by the <br />WMD. (Project ranked 12/17 — not funded per 6/13/17 email.) <br />Commissioner Adams (the designated liaison for IRLNEP) was briefed on the application prior to <br />the presentation to the IRLNEP selection committee. <br />Conservation Lands Program Update — Informational Item <br />July 2017 <br />P9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.