Laserfiche WebLink
The following is a summary of costs. <br />Charge Associated with New Total <br />This Amendment Compensation <br />Roadway Design <br />Geotechnical Services (Tierra)...NNN.....N.N....1..... ........ .......... .... $0.00 $35,487.50 <br />Engineering NNNN.......N........... ........ ..... N N ...... .....N ....... ....... $29,500.00 $342,297.03 <br />(ARCADIS) <br />Signal PlansN......NNN...........N...NN........NN....................o................. $0.00 $31,48&41 <br />(SIMMONS & WHITE Inc.) <br />Stormwater Pollution Prevention plans ....... ........ .... N . ................. $0.00 $9,02292 <br />(ARCADIS) (/j� <br />Perms{iing.N....N.NNNNN.N.N...N.NN.N..............NN....NNN.N.N.NN......N. $w00 $33,090 <br />.00 <br />(ARCADIS) <br />surveying <br />Design Survey..N..NNN...NN......N.N........... ...... ..... ....... ....... NN $1,313.20 $65,003-60 <br />(ARCADIS) <br />Right of Way Survey and Map ......................................................... $0.00 $20,38640 <br />(ARCADIS) <br />Structural Design <br />Structural Design for SR 60 over <br />Main Relief Canal bridge ............................... ...................N............. $0.00 $76,060.00 <br />(Bridge Design Associates, Inc.) <br />Structural Design for 431 Avenue over <br />Main Relief Canal bridge.NN......N..N.N.N....................................... $0.00 $67,604.00 <br />(Bridge Design Associates, Ina) <br />Page 4 of 6 <br />GALNR SupportiProposa1s\WPB124171SR 60 & 43rd AvenuelSR60 - 43RD AVE AMENDMENT 8 7-8-17.doc <br />1 <br />P67 <br />