My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-147
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 1:19:57 PM
Creation date
10/6/2017 1:19:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
10/03/2017
Control Number
2017-147
Agenda Item Number
15.B.3.
Entity Name
CDM Smith
Subject
Segment 3 Expansion
Segment 2 Partial Closure and Landfill Gas System Expansion
Area
Design Permitting and Bidding Svs
Alternate Name
Amendment No. 1 to Work Order No. 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> WORK ORDER NO. 1 -AMENDMENT 1 <br /> INDIAN RIVER COUNTY LANDFILL <br /> SEGMENT 3 CELL 2 EXPANSION,SEGMENT 2 PARTIAL CLOSURE,AND <br /> LANDFILL GAS SYSTEM EXPANSION <br /> PHASE II-DESIGN, PERMITTING,AND BIDDING SERVICES <br /> This Amendment 1 to Work Order No. 1,when executed,shall be incorporated in and become part <br /> of the Agreement for Consulting Services between Indian River County Solid Waste Disposal <br /> District(SWDD) and CDM Smith Inc., (CONSULTANT),dated July 18, 2017 hereafter referred to as <br /> the AGREEMENT. <br /> BACKGROUND <br /> The SWDD,the owner and operator of the Indian River County Landfill,has requested that <br /> CONSULTANT prepare this Work Order to provide professional engineering services for the design, <br /> permitting,and bidding for the proposed Class I Landfill Segment 3 Cell 2 expansion,Segment 2 <br /> Partial Closure,and expansion of the landfill gas collection (LFG) system.The proposed new cell is <br /> Cell 2 of Segment 3 (approximately 10.6 acres in size),as shown on Drawing No. 5 of the 20-Year <br /> Permit Drawings dated September 2015. Segment 3 Cell 2 will be located immediately to the east of <br /> the existing Segment 3 Cell 1.The proposed Segment 2 Partial Closure (approximately 25 acres in <br /> size) includes closure of the Segment 1/Infill vertical expansion area and the final elevations of <br /> Segment 2,which has historically been referred to as the Segment 2C area. Expansion of the LFG <br /> system within Segment 2 is proposed to be constructed concurrently with the Segment 2 Partial <br /> Closure so that the final components can be installed prior to the closure cap being constructed. <br /> Phase I of this project is currently under way and includes data collection,geotechnical services, <br /> and surveying services to be utilized in design and permitting phase.The Scope of Services for <br /> Phase II of this project is described below: <br /> SCOPE OF SERVICES <br /> CONSULTANT will undertake the design,permitting,and bidding of the Class I Landfill Segment 3 <br /> Cell 2 expansion,Segment 2 Partial Closure,and LFG system expansion located at the Indian River <br /> County Landfill.The design will include the Segment 3 Cell 2 bottom liner system,leachate <br /> collection and conveyance systems,and stormwater management facilities,Segment 2 Partial <br /> Closure cap liner system and stormwater management facilities,and the Segment 2 LFG system <br /> expansion.CONSULTANT will also include an access roadway,leachate pump station and force <br /> main design services as requested by SWDD to support future cell expansion. CONSULTANT will <br /> modify,update,and make additions to the existing permit drawings previously prepared in 2010 <br /> and updated in 2015 by Geosyntec to prepare final design drawings and specifications.The <br /> procedures of Rule 61G15-27.001, Florida Administrative Code (F.A.C.) will be followed for <br /> successor engineer requirements of the Florida Board of Professional Engineers. <br /> Based on recent discussions with SWDD staff and our familiarity with the landfill site and <br /> preliminary review of the existing permit drawings,the proposed Scope of Services includes the <br /> following tasks: <br /> A-1 jj2077_Exhibit A docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.