Laserfiche WebLink
rj Sullivan Cor <br />GENERAL CONTRACTOR <br />September 2, 2014 <br />Mr. Mark Miller <br />Kimley-Horn and Associates, Inc. <br />1920 Wekiva Way, Suite 200 <br />West Palm Beach, FL 33411 <br />Re: Indian River County Utilities <br />R.O. Plants Lime Slurry Injection <br />Relocate pH Probes at North RO Plant <br />Dear. Mr. Miller, <br />PCO 17 <br />In accordance with your instructions, we have relocated the two pH probes at the East <br />Clearwell. This work included removing the probes from their original location, coring <br />holes in two access hatches, installing flanges to install the probes and installing <br />conduits to the new locations. Our estimate for this extra work is as follows. <br />Electrical conduit relocation (Paragon) <br />Blind flanges, Van -Stone flanges and flange accessories <br />Labor 8 man hours at '.40.00/MH <br />Subtotal <br />Mark-Up on Electrical Sub <br />Mark-up on RJSC work <br />Additional Bond & Insurance <br />Total <br />$870.00 <br />140.00 <br />320.00 <br />$1,330.00 <br />43.50 <br />69.00 <br />42.61 <br />1,485.11 <br />Please add the above extra work to the next change order. <br />Sincerely, <br />obert D. Mullen <br />Project Manager <br />cc: Proposed Change Order File, Job 348 <br />2001 N.W. 22nd Street • Pompano Beach, FL 33069 <br />Phone 954-975-0388 • Fax 954_975-3333 <br />75 <br />