Laserfiche WebLink
DocuSign Envelope ID:27562A39-5489-4980-BOFD-AEIDCBC76974 <br /> • STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-01040 <br /> LOCAL AGENCY PROGRAM AGREEMENT PROGRAM MANAGEMENT <br /> OGC-08/15 • <br /> Page 1 <br /> EXHIBIT"A" <br /> PROJECT DESCRIPTION AND RESPONSIBILITIES <br /> FPN:436860-1-58-01 <br /> This exhibit forms an integral part of the Local Agency Program Agreement between the State of Florida, Department of <br /> Transportation and <br /> Indian River County <br /> PROJECT LOCATION: <br /> 0 The project is on the National Highway System. <br /> ❑The project is on the State Highway System. <br /> PROJECT LENGTH <br /> AND MILE POSTI <br /> L MITS:2.471 Miles <br /> • <br /> PROJECT DESCRIPTION: Indian River Blvd. Sidewalk Improvements from 37th St. to 53'" St. Construction of a 6'wide <br /> concrete sidewalk, pedestrian crossing improvements at the Indian River Blvd. and 37th St. intersection, the Indian River <br /> Blvd. and 41st St. intersection, and the Indian River Blvd. and 45th St. intersection, drainage improvements, earthwork, <br /> maintenance of traffic, erosion control and pavement markings. <br /> SPECIAL CONSIDERATIONS BY AGENCY: <br /> The audit report(s) required in the Agreement shall include a Schedule of Project Assistance that will reflect the <br /> Department's contract number, the Financial Project Number (FPN), the Federal Authorization Number (FAN), where <br /> applicable,the amount of state funding action(receipt and disbursement of funds), any federal or local funding action, and <br /> the funding action from any other source with respect to the project. <br /> The Agency is required to provide a copy of the design plans for the Department's review and approval to coordinate <br /> permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br /> The Agency shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br /> accordance with the following schedule: <br /> a)Study to be completed by N/A . <br /> b)Design to be completed by N/A . <br /> c)Right-of-Way requirements identified and provided to the Department by N/A . <br /> d)Right-of-Way to be certified prior to advertising for construction(All Phase 58 LAPS) <br /> e)Construction contract to be let by 3/12/2018. <br /> f) Construction to be completed by 12/31/2019. <br /> If this schedule cannot be met, the Agency will notify the Department in writing with a revised schedule or the project is <br /> subject to the withdrawal of federal funding. <br /> SPECIAL CONSIDERATIONS BY DEPARTMENT:N/A <br />