My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/22/1992
CBCC
>
Meetings
>
1990's
>
1992
>
9/22/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:33 PM
Creation date
6/16/2015 11:19:02 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/22/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP 2 vqn� now7 <br />WEST REGIONAL WASTEWATER TREATMENT PLANT REUSE PUMPING STATION <br />The Board reviewed memo from Utility Services Director Terry <br />Pinto dated September 14, 1992: <br />DATE: SEPTEMBER 14, 1992 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILI SERVICES <br />PREPARED WILLIAM F. cCAIN <br />AND'STAFFED CAPITAL ECTS NGINEER <br />BY: DEPAR UTILITY SERVICES <br />SUBJECT: WEST REGIONAL WASTEWATER TREATMENT PLANT (WR WWTP) <br />REUSE PUMPING STATION <br />INDIAN RIVER COUNTY PROJECT NO. IIS -87 -07 -DC <br />BACKGROUND <br />On April 16, 1991, the Indian River County Board of County <br />Commissioners approved a Work Authorization with the engineering <br />firm of Camp Dresser & McKee, Inc. (CDM) to redesign the WR WWTP <br />Reuse Pumping and Distribution System (see attached Work <br />Authorization, Scope of Services, and Meeting Minutes). The basis <br />of this redesign was to modify pumping capabilities not only to the <br />citrus growers west of the plant, but also to the central effluent <br />disposal site and the proposed deep well in the southwest part of <br />the County. The Utilities Department is now prepared to construct <br />the reuse pumping station and reuse delivery line to 4th Street. <br />AN_ <br />Attached is the proposed Work Authorization (No. 24) with CDM, Inc., <br />for bidding and related construction services for this project. <br />Accompanying the Work Authorization is a detailed breakdown of the <br />Scope of Services. The Work Authorization is broken into three <br />tasks; and the costs associated with these tasks are as follows: <br />Bidding Services $ 6,990 (lump sum) <br />General Services During Construction $ 9,690 (lump sum) <br />Project Representative Services $12,750 (upper limit) <br />Construction Contingency (if required) $ 3,500 <br />The total cost for these services is approximately 8.9% of the <br />estimated construction cost and is well within acceptable limits for <br />a project of this magnitude. <br />RECOMMMIDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve and authorize for execution <br />the attached Work Authorization No. 24 with CDM. <br />58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.