ORDER NO. PSC -2017 -0336 -PAA -EQ <br />DOCKET NO. 20170072 -EQ <br />PAGE 89 <br />Attachment A <br />DUKE <br />ENERGY. <br />SECTION No. IX <br />FIRST-SECOND REVISED SHEET No. 9.701 <br />CANCELS FIRST REVISED SHEET No. 9.701 <br />2.5. 24—"Emergency Condition" means (a) any urgent, abnormal, operationally unstable, <br />dangerous, and/or public safety condition that is existing on the Company's system; (b) <br />any urgent, abnormal, operationally unstable, dangerous, and/or public safety condition <br />that is likely to result in any of the following: (i) loss or damage to the Facility and/or the <br />Company's system, (ii) disruption of generation by the Facility, (iii) disruption of <br />service or stability on the Company's system, and/or (iv) endangerment to human life or <br />public safety; and/or, (c) any circumstance that requires action by the Company's <br />System Operator to comply with standing NERC regulations or standards, including <br />without limitation actions to respond to, prevent, limit, or manage loss or damage to the <br />Facility, loss or damage to the Company's system, disruption of generation by the <br />Facility, disruption of service on the Company's system, an abnormal condition on the <br />Company's system, and/or endangerment to human life or safety. An Emergency <br />Condition will be an excuse to QF's performance only if such condition is not due to <br />QF's negligence, willful misconduct, and/or failure to perform as required under this <br />Agreement. <br />2.6. 23—"Execution Date" means the date on which the Co y-Pafies executes this <br />Agreement. <br />23. 2:6-7acility" means all equipment used to produce electrical output- and, for a <br />cogeneration facility, used to produce useful thermal energy through the sequential use <br />of energy. <br />2.8. 2.—"Facilities Study" means a written cost estimate of all the required materials and <br />labor to complete the interconnection of the Facility with the Company's electrical <br />system, and an estimate of the date by which construction of the interconnection will be <br />completed. <br />2.9. 2$ --"Feasibility Study" means a review of the alternatives and operational <br />requirements reasonably available to interconnect the Facility to the Company's electric <br />system and identification of a feasible interconnection alternative. <br />2.10.2:4—"Indemnified Party" has the meaning assigned to it in Section 12.1. <br />2.11.2.1.0")ndemning Party" has the meaning assigned to it in Section 12.2, <br />ISSUED BY: Javier Portuondo, Director. Rates 8 Regulatory Strategy - FL <br />EFFECTIVE October -14.2036 <br />