Laserfiche WebLink
ORDER NO. PSC -2017 -0336 -PAA -EQ <br />DOCKET NO. 20170072 -EQ <br />PAGE 93 <br />Attachment A <br />b DUKE <br />ENERGY° <br />SECTION No. IX <br />SGEOND- HIRD REVISED SHEET No. 9.703 <br />CANCELS SECOND REVISED SHEET No. 9.703 <br />3.0 3:0 -Submission of Plans and Development of Interconnection Schedules and Cost Estimates <br />3.1. 3.1 No later than sixty (60) days after the Execution Date, the QF shall specify the <br />date it desires the Company's Interconnection Facilities to be available for receipt of the <br />electric energy and shall complete and submit, along with a deposit to cover Company's <br />costs to perform interconnection studies, an Interconnection Request Application, to the <br />Company. At such time, the QF shall deliver to the Company the Facility's preliminary <br />design, engineering, and operational specifications for purposes of interconnecting with <br />Company's system. Based upon the information provided, the Company shall consider <br />the reasonable alternatives available to interconnect the QF in a Feasibility Study within <br />sixty (60) dans after all information requested by the Company is provided by the OF. <br />3.2. The QF shall, within thirty (30) days from receipt of the Feasibility Study, send written <br />notification to the Company as to whether or not it will continue the Facility to the next <br />study phase. The Company will consider no response as OF's withdrawal of the Facility <br />from further consideration. No more than thirty (30) dans following receipt of such <br />notice. The -the Company and the QF shall meet and discuss interconnection alternatives <br />and the QF's reasonable preference for interconnecting the Facility to the Company's <br />electrical system. Once the QF has communicated a reasonable- interconnection <br />preference, the Company shall develop in a System Impact Study preliminary written <br />Interconnection Costs and scheduling estimates for the Company's Interconnection <br />Facilities within sixty (60) days after all information requested by the Company is <br />provided by the QF. The schedule developed hereunder will indicate when the QF's <br />final electrical plans must be submitted to the Company pursuant to sectien-Section 3.2-3 <br />hereof. <br />3.3. 3 --The OF shall, within thirty (30) dans from receipt of the System Impact Study, <br />send written notification to the Company as to whether or not it will continue the Facility <br />to the next study phase. The Company will consider no response as OF's withdrawal of <br />the Facility from further consideration. The -Along with such notification, the QF shall <br />submit the Facility's final design, engineering, and operational specifications and all <br />revisions to the information previously submitted under section -Section 3.1 hereof to the <br />Company no later than the date specified pursuant toSection 3.1 <br />hereof, unless such date is modified in the Company's sole discretion. Based upon the <br />information provided and within sixty (60) days after the information is provided, the <br />Company shall update its written Interconnection Costs and schedule estimates, provide <br />the estimated time period required for construction of the Company's Interconnection <br />Facilities, and specify the date by which the Company must receive notice from the QF <br />ISSUED BY: Javier Portuondo. Director. Rates & Regulatory Strategy - FL <br />EFFECTIVE:October-434M <br />