My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2017 -0336 -PAA -EQ <br />DOCKET NO. 20170072 -EQ <br />PAGE 15 <br />Attachment A <br />(� DUKE <br />ENERGY° <br />SECTION No. IX <br />FOURTH REVISED SHEET NO. 9.407 <br />CANCELS THIRD REVISED SHEET NO. 9.407 <br />"Creditworthy" with respect to a Party or its Credit Support Provider, as applicable, means a <br />party is rated at least BBB by Standard & Poor's (S&P), or at least Baa3 by Moody's Investor <br />Services (Moody's). Rating shall be the unsecured, senior long-term debt rating (not supported <br />by third party credit enhancement) or the issuer rating will be used if not available. If a Party or <br />its Credit Support Provider, as applicable, is rated by both S&P and Moody's, then the lower of <br />the two ratings will apply. <br />"DEF" has the meaning assigned to it in the opening paragraph of this Contract. <br />"DEF Entities" has the meaning assigned to it in Section 16. <br />"Demonstration Period" means a sixty -hour period in which the Committed Capacity Test must <br />be completed. <br />"Distribution System" means the distribution system consisting of electric lines, electric plant, <br />transformers and switchgear used for conveying electricity to ultimate consumers, but not <br />including any part of the Transmission System. <br />"Dispute" shall have the meaning assigned to it in Section 20.9. <br />"Prop Dead Date" means the date which is twelve (12) months following the Execution Date <br />except for the condition defined in Section 5(a)(i). The Parties recognize that firm transmission <br />service agreements can take up to 24 months to obtain so for Section 5(a)(i) only the Drop Dead <br />Date means the date which is twenty four (24) months following the Execution Date. <br />"Eastern Prevailing Time" or "EPT' means the time in effect in the Eastern Time Zone of the <br />Unites States of America, whether Eastern Standard Time or Eastern Daylight Savings Time. <br />"Effective Date" has the meaning assigned to it in Section 5. <br />"Electrical Interconnection Point" means the physical point at which the Facility is connected <br />with the Transmission System or, if RF/QF interconnects with a Transmission System other than <br />DEF's, DEF's interconnection with the Transmission Provider's Transmission System, or such <br />other physical point on which RF/QF and DEF may agree. <br />ISSUED BY: Javier Po,tuondo, Dlreetor, Rates & Regulatory Strategy - FL <br />EFFECTIVE June 9. 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.