My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2017 -0336 -PAA -EQ <br />DOCKET NO. 20170072 -EQ <br />PAGE 21 <br />Attachment A <br />DUKE <br />ENERGY. <br />SECTION No. IX <br />THIRD REVISED SHEET NO. 9.413 <br />CANCELS SECOND REVISED SHEET NO. 9.413 <br />"RF/OF Insurance" has the meaning assigned to it in Section 17. <br />"RF/QF Performance Security" has the meaning assigned in Section 11. <br />"Security Documentation" has the meaning assigned to it in Section 12. <br />"Terni" has the meaning assigned to it in Section 3. <br />"Termination Date" means the date upon which this Contract terminates unless terminated earlier <br />in accordance with the provisions hereo£ This date is specified in Section 4. <br />"Termination Fee" means the fee described in Appendix B as it applies to any Capacity <br />Payments made under Option B, C or D. <br />"Termination Security" has the meaning assigned to it in Section 12. <br />"Transmission Provider" means the operator(s) of the Transmission System(s) or any successor <br />thereof or any other entity or entities authorized to transmit Energy on behalf of RF/QF from the <br />Electrical Interconnection Point. <br />"Transmission System" means the system of electric lines comprised wholly or substantially of <br />high voltage lines, associated system protection, system stabilization, voltage transformation, and <br />capacitance, reactance and other electric plant used for conveying electricity from a generating <br />station to a substation, from one generating station to another, from one substation to another, or <br />to or from any Electrical Interconnection Point or to ultimate consumers and shall include any <br />interconnection owned by the Transmission Provider or DEF, but shall in no event include any <br />lines which the Transmission Provider has specified to be part of the Distribution System except <br />for any distribution facilities required to accept capacity and energy fmm the Facility. <br />ISSUED 6Y: Javier Portuondo, Mostar, Rates a Rogutatory Strategy - Ft. <br />EFFECTIVE Jtdy21.2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.