My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENT AGENDA <br />INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: Jason E. Brown <br />County Administrator <br />THROUGH: Richard B. Szpyrka, P.E. <br />Public Works Director <br />FROM: James D. Gray, Jr. <br />Coastal Engineer <br />SUBJECT: Release of Retainage - Work Order No. 3 Morgan & Eklund, Inc. <br />2017 Beach Profile Monitoring Surveys (SUMMER) <br />DATE: August 30, 2017 <br />DESCRIPTION AND CONDITIONS <br />On October 4, 2016, the Board approved a contract with Morgan and Eklund, Inc. (M&E) for <br />Professional Land Surveying and Mapping Services for a two-year term. The Board amended the <br />Contract on October 18, 2016. M&E is the selected County Consultant for professional <br />onshore/offshore hydrographic surveying services. <br />On June 13, 2017, the Board approved Work Order No. 3 to this contract for services related to <br />semiannual hydrographic surveying (beach profile) for the countywide shoreline monitoring <br />program. Specifically, Work Order No. 3 was for summer 2017 beach profile surveys in the <br />amount of $55,000 and included 3 separate tasks and 3 separate project accounts. <br />To date all tasks are 100% complete. The total amount of retainage withheld under Work Order <br />No. 3, over 3 separate accounts, is $5,500. <br />Task 1: Summer 2017 Sector 3 Beach and Dune Restoration Project Post Construction Monitoring <br />Survey (R -20-R-60) <br />Task 1 totaled $22,550. The total amount of retainage withheld is $2,255. <br />Task 2: Summer 2017 Sector 7 Post Construction Monitoring (R -97-R-108) <br />Task 2 totaled $6,600. The total amount of retainage withheld is $660. <br />Task 3: Summer 2017 Countywide Beach Monitoring (R-61 — R-96 and R -109-R-119) <br />Task 3 totaled $25,850. The total amount of retainage withheld is $2,585 <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@1426BEB9\ n CL@1426BEB9.docx <br />P232 <br />
The URL can be used to link to this page
Your browser does not support the video tag.