My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
panel for each of the wells via the DH+ to ethernet bridge in the main PLC and <br />incorporate these well controls into the existing well/train logic for control of these <br />systems. <br />Consultant and CSD will implement the changes onsite to the main PLC, load the <br />new PLC and establish communications and verify communications and <br />operability. <br />Consultant and CSD will modify the SCADA system database to add all new points <br />relative to the new systems, any older or modified systems to establish a complete <br />interface. <br />Consultant and CSD will Commission all I/O, startup and checkout the system, <br />based on 1 day onsite and follow-up remotely. Consultant and CSD will provide <br />warranty service for one year after startup. <br />SCHEDULE <br />In general, consultant will work as expeditiously as possible and concurrent with <br />well contractors schedule. <br />FEE SCHEDULE <br />We will provide these services in accordance with our Continuing Services Contract <br />Agreement for Professional Services dated November 15, 2011, with Indian River <br />County, expiring November 16th, 2017. <br />The Consultant will provide professional services for Task 1 on a lump sum fee <br />basis as follows: <br />Task No. <br />Task <br />Task Fee <br />TASK 1 <br />WELL S-7 AND S-4 PROGRAMMING <br />$24,992 <br />TOTAL <br />$24,992 <br />ADDITIONAL SERVICES <br />The following services are not included in the Scope of Services for this project, but <br />may be required depending on circumstances that may arise during the execution <br />of this project. Additional services include, but may not be limited to the following: <br />K:\WPB_Civi1\044572039 - SCRO Well S-4 Replacement \Admin\Exhibit A Well S7 and S4 SCADA Programming 8.15.17.dooxPage 2 <br />of 3 <br />P247 <br />
The URL can be used to link to this page
Your browser does not support the video tag.