My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESCRIPTION <br />HOURS LABOR <br />IRC South Plant Well 7 Addition <br />1 Submittal review of new control panel and modifications to well 7 and the main PLC panel in 4 $ 600.00 <br />the control room. <br />After finalization of the submittals from all vendors, create modifications for changes to the <br />2 main processors to accept the additional RIO panel for each of the wells via the DH+ to 20 $ 2,500.00 <br />ethernet bridge in the main PLC and incorporate these well controls into the existing <br />well/train logic for control of these systems. <br />3 Implement the changes onsite to the main PLC, load the new PLC and establish 15 $ 1,875.00 <br />communications and verify communications and operability. <br />4 Modify the scada system database to add all new points relative to the new systems, any <br />older or modified systems to establish a complete interface. <br />5 Commission all I/O, startup and checkout the entire system, based on 1 day onsite and <br />followup remotely. <br />6 Provide warranty service for one year after startup <br />TOTAL <br />IRC South Plant Well 4 Addition <br />15 $ 1,875.00 <br />16 $ 2,000.00 <br />10 $ 1,250.00 <br />80 $ 10,100.00 <br />1 Submittal review of new control panel and modifications to well 7 and the main PLC panel in 10 $ 1,500.00 <br />the control room. <br />After finalization of the submittals from all vendors, create modifications for changes to the <br />2 main processors to accept the additional RIO panel for each of the wells via the DH+ to 20 $ 2,500.00 <br />ethernet bridge in the main PLC and incorporate these well controls into the existing <br />well/train logic for control of these systems. <br />3 <br />4 <br />5 <br />Implement the changes onsite to the main PLC, load the new PLC and establish <br />communications and verify communications and operability. <br />Modify the scada system database to add all new points relative to the new systems, any <br />older or modified systems to establish a complete interface. <br />Commission all I/O, startup and checkout the entire system, based on 1 day onsite and <br />followup remotely. <br />6 Provide warranty service for one year after startup <br />TOTAL <br />15 $ 1,875.00 <br />15 $ 1,875.00 <br />16 $ 2,000.00 <br />10 $ 1,250.00 <br />86 $ 11,000.00 <br />GRAND TOTAL FOR BOTH SITES <br />166 $ 21,100.00 <br />South RO Wells 7 and 4 Upgrades Quotation as of 8/1/2017 - Page 1 of 1 <br />P249 <br />
The URL can be used to link to this page
Your browser does not support the video tag.