My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2017 -0336 -PAA -EQ <br />DOCKET NO. 20170072 -EQ <br />PAGE 27 <br />Attachment A <br />(t) DUKE <br />1 ENERGY. <br />7. Committed Capacity/Capacity Delivery Date <br />SECTION No. IX <br />FIFTH SIXTH REVISED SHEET NO. 9.418 <br />CANCELS FOURTH -FIFTH REVISED SHEET NO. <br />9.418 <br />7.12 If the RF/QF commits to sell capacity to DEF, the amount of which shall be <br />determined in accordance with this Section 7. Subject to Section 7.34, the <br />Committed Capacity is set at kW, with an expected Capacity Delivery <br />Date on or before the Required Capacity Delivery Date. <br />7.23 Capacity testing of the Facility (each such test a Committed Capacity Test) shall <br />be performed in accordance with the procedures set forth in Section 8. The <br />Demonstration Period for the first Committed Capacity Test shall commence no <br />earlier than ninety (90) days before the Required Capacity Delivery Date and <br />testing must be completed before the Avoided Unit In -Service Date or an earlier <br />date in Appendix E. The first Committed Capacity Test shall not be successfully <br />completed unless the Facility demonstrates a Capacity of at least one hundred <br />percent (100%) of the Committed Capacity set forth in Section 7.13. Subject to <br />Section 8.1, the RF/QF may schedule and perform up to three (3) Committed <br />Capacity Tests to satisfy the requirements of the Contract with respect to the first <br />Committed Capacity Test <br />7.34 In addition to the first Committed Capacity Test, DEF shall have the right to <br />require the RF/QF, after notice of no less than ten (10) Business Days prior to <br />such proposed event, to validate the Committed Capacity by means of a <br />Committed Capacity Test at any time, up to two (2) times per year, the results of <br />which shall be provided to DEF within seven (7) calendar days of the conclusion <br />of such test On and after the date of such requested Committed Capacity Test, <br />and until the completion of a subsequent Committed Capacity Test, the <br />Committed Capacity shall be set at the lower of the Capacity tested or the <br />Committed Capacity as set forth in Section 7.12. Provided however, any such <br />second test requested within a twelve (12) month period must be for cause. <br />ISSUED BY: Javier Portuondo, Director, Rates 8 Regulatory Strategy - FL <br />1 EFFECTIVE: July -39r2044 <br />
The URL can be used to link to this page
Your browser does not support the video tag.