My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
perimeters. In addition, the landscape plan adequately addresses interior landscape requirements <br />such as lake shoreline trees around the project's stormwater pond, parking lot landscaping, and <br />common area landscaping. Prior to issuance of an LDP, the applicant will need to submit and <br />obtain Planning staff approval of a final landscape and buffer plan. <br />12. Parking: Adequate parking will be provided as shown below. <br />Required Proposed <br />Tire store: 18 18 <br />Multi -tenant strip building: 109 110 <br />Stand-alone fast food: 47 48 <br />Stand-alone restaurant: 71 73 <br />Hotel: 110 110 <br />Total: 355 359 <br />13. Traffic Circulation: The conceptual PD plan provides a right-in/right-out driveway connection to <br />SR 60. The SR 60 driveway will be served by an eastbound right -turn lane on SR 60. The plan also <br />provides two-way driveway interconnections to the commercial properties to the east (Sonny's <br />BBQ) and west (Applebee's). The project has been designed to provide an exclusive north/south <br />driveway from SR 60 to the hotel site at the rear (south) of the overall project site, and a semi - <br />exclusive east/west driveway from the eastern interconnection with Sonny's BBQ to the western <br />interconnection with Applebee's. The applicant has an existing access easement across the <br />Applebee's site to the west. <br />The driveway interconnection to the west will ultimately connect to the signalized SR 60 driveway <br />(a.k.a. "53rd Avenue") that serves the Walmart site as well as Applebee's and a small strip center. <br />In order to ensure that adequate legal access is established for project traffic to utilize the Walmart <br />north/south driveway, the applicant has entered into an easement agreement with Walmart. That <br />easement agreement ensures formal integration with the Walmart area traffic circulation system and <br />will be recorded once the applicant purchases the subject property. A copy of the recorded <br />easement will need to be provided to Planning staff prior to PD plan release. <br />The project's traffic impact analysis identified several required or recommended off-site <br />improvements, described as follows. The existing westbound left -turn lane at the intersection of SR <br />60 and 531-d Avenue is required to be extended in order to accommodate additional vehicle queue <br />length. Also, the northbound left -turn lane on the north/south Walmart driveway (a.k.a. "53rd <br />Avenue") is recommended to be extended to accommodate additional vehicle queue length. <br />Because the Walmart driveway is a privately owned driveway, and is not a public right-of-way, the <br />applicant will be required to make a good faith effort to obtain approval/authorization from <br />Walmart to install the recommended turn lane improvements on Walmart property. However, the <br />applicant cannot guarantee that Walmart will approve/authorize the recommended turn lane <br />improvements in a timely manner. Therefore, the applicant has agreed to provide a two-year <br />construction bond to cover the cost of the turn lane improvements in order to allow additional time <br />to obtain approval/authorization from Walmart or allow Walmart to definitively reject the proposed <br />(and beneficial) driveway improvement. The two-year construction bond must be provided prior <br />issuance of a Certificate of Occupancy (C.O.) for the proposed hotel (Phase II). <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@5C095483\@BCL@5C095483.docx 7 <br />P276 <br />
The URL can be used to link to this page
Your browser does not support the video tag.