My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. Stormwater Management: The preliminary stormwater plan, as approved by Public Works, <br />proposes a master stormwater system that includes a wet stormwater treatment area located in the <br />southeast corner of the overall project site and a dry stormwater treatment area in the southwest <br />corner of the overall project site. Final design of the stormwater management system will be <br />reviewed via the project's land development permit (LDP). Prior to issuance of an LDP, the <br />applicant must obtain a County stormwater permit. <br />16. Utilities: The entire development will be served by County water and sewer. Those utility <br />provisions are consistent with applicable LDRs, and have been approved by the Department of <br />Utility Services and the Health Department. The developer will need to obtain an LDP and utility <br />permits prior to the construction of each phase. <br />17. Concurrency: As required under the County's concurrency regulations, the applicant has applied <br />for and obtained a conditional concurrency certificate for the project. The concurrency certificate <br />was issued based upon a concurrency analysis and a determination that adequate capacity was <br />available to serve this project at the time of the determination. Prior to issuance of a building permit <br />for each building, the developer will be required to obtain a final concurrency certificate in <br />accordance with County concurrency regulations. <br />18. Environmental Issues: <br />• Uplands: Since the site is over five acres, the County's native upland set-aside requirement <br />potentially applies; however, County Environmental Planning staff has determined that no <br />intact native upland plant communities exist on the project site. Therefore, no native upland <br />set-aside requirements apply to the proposed development. <br />• Wetlands: Based on a survey of the subject site and staff verification, there are no <br />jurisdictional wetlands on the subject site. Therefore, no wetlands criteria apply to the <br />proposed development. <br />• Tree Preservation/Mitigation: The site is heavily wooded and contains a number of <br />protected and specimen trees. In order to provide an additional public benefit, the applicant <br />conducted a thorough analysis of the existing protected and specimen trees, and coordinated <br />field meetings with Environmental Planning staff. The analysis identified a healthy 42" live <br />oak tree that will be preserved in place. Also, the applicant is proposing to relocate 7 <br />mature canopy trees on site, and approximately 50 existing cabbage palm trees. The canopy <br />trees will be relocated to the perimeter landscape buffer located along the southern property <br />boundary, and the relocated cabbage palm trees will be utilized throughout the overall site. <br />Mitigation is required for removal of the remaining native hardwood trees over 12" dbh and <br />cabbage palms with 10' or more of clear trunk. All invasive exotics will be removed during <br />development. Prior to issuance of tree removal and land clearing permits, the applicant <br />must obtain Environmental Planning staff approval of the project's final tree protection and <br />mitigation plan. <br />19. Corridor Architectural Requirements: The project site is located within the SR 60 Corridor and <br />is subject to the SR 60 Corridor criteria. Preliminary architectural building elevations have been <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@5C095483\@BCL n 5C095483.docx <br />9 <br />P278 <br />
The URL can be used to link to this page
Your browser does not support the video tag.