My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prior to issuance of land clearing and tree removal permits, the applicant shall obtain <br />Environmental Planning staff approval of the project's final tree protection and mitigation <br />plan. <br />3. Prior to issuance of a land development permit (LDP), the applicant shall: <br />a. Obtain Planning staff approval of a final landscape and buffer plan. <br />b. Obtain County staff approval of the final design of all off-site improvements. <br />4. Prior to issuance of the first project certificate of occupancy (C.O.), the applicant shall: <br />a. Install all required on-site mitigation trees. <br />b. Install all landscape and opaque feature improvements along all project perimeters, <br />as depicted on the approved conceptual PD plan. <br />c. Extend the westbound left -turn lane at SR 60 and 53rd Avenue, extend the <br />eastbound left -turn lane at the existing median opening south of the Advance Auto <br />Parts, and obtain FDOT and Public Work's approval of the turn lane construction. <br />d. Construct an eastbound right -turn lane on SR 60 at the project's entrance, relocate <br />the SR 60 sidewalk, and obtain FDOT and Public Work's approval of the turn <br />lane/sidewalk construction. <br />5. Prior to issuance of a certificate of occupancy (C.O.) for the proposed hotel facility (Phase <br />II), the applicant shall either extend the northbound left -tum lane on Walmart's north/south <br />driveway (a.k.a. "53rd Avenue") or provide a two-year construction bond to guarantee a <br />post-C.O. two-year construction window (construction subject to Walmart's authorization). <br />ATTACHMENTS: <br />1. Application <br />2. Excerpt from August 10, 2017 PZC Minutes <br />3. Location Map <br />4. PD Rezoning Ordinance <br />5. Aerial <br />6. Conceptual PD Plan <br />7. Preliminary Landscape Plan <br />8. Preliminary Architectural Building Elevations <br />C:\Users\Iegistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@5C095483\@BCL a 5C095483.docx 11 <br />P280 <br />
The URL can be used to link to this page
Your browser does not support the video tag.